Laserfiche WebLink
<br /> <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />f <br /> <br />. <br />I <br />, <br />~ <br /> <br />.--- '"' <br /> <br />- - <br /> <br />Coral Way Beautification Master Plan and Design <br />Guidelines - Miami, FL <br />AWARD <br />Award of Honor, American Society of Landscape <br />Architects, Florida Chapter <br /> <br />Under our general landscape architect services contract <br />with the City of Miami, the firm was selected to prepare a <br />beautification master plan and design guidelines for the <br />historic Coral Way Corridor. Preserving and enhancing the <br />night visibility of the 75-year old Banyan trees was a <br />critical component of this project. Lighting demonstrations <br />were conducted with the public to select the optimal <br />lighting effect for these historic trees. Based on the tenets <br />of New Urbanism, design guidelines were prepared to <br />regulate the building heights, setback, mass, landscape, <br />parking, and overall relationship to Coral Way. <br /> <br />Client Reference: <br />Enrique D. Nunez, Planner <br />City of Miami, Department of Planning & Development <br />Phone: (305) 416-1419 <br /> <br />Completed: Design 2002 <br />Total Fees Paid to Firm: $75,000 <br />Total Cost of Design and Construction, Estimated and <br />Actual: N/A <br />Project Duration: 1 year <br /> <br /> <br />l)rL'~..;erl'"1" dJh/l..."llcl110JItl ti,t' <br />lIi91'1 ,'i~;}'ilill/ "f ti,e' 7':;-I/'>(//' ,,1./ <br />15dll!lllll 'rL'L'~ tt'll~ II iTil;,',,/ <br />C01JlpOI1l.-'II/ 0/ t11i~ /JI'ojl.'d <br /> <br />UZ290066.07-0 Heritage Park & Parking Garage.qxp <br />@2007 Kim/ey.Horn and Associates, Inc. <br /> <br />. <br />Multi-Story Target Parking Deck - Deerfield <br />Beach, FL <br />When the Target Corporation wanted to expand their store <br />in Deerfield Beach, Florida, an area with limited available <br />local property, the most profitable solution was to tear <br />down the existing store and build a two-story expansion in <br />its place. Since the new Target-the first two-story Target <br />store in Florida-would require more parking space than <br />was available on the property, Kimley-Horn was retained to <br />design an adjacent two-level parking facility. <br /> <br />The parking deck has three open stair towers, one <br />enclosed stair tower, and one elevator. Automobile access <br />to the elevated parking level is provided by an external <br />speed ramp that is a combination of both precast and <br />cast-in-place components. Precast concrete facades were <br />detailed to match the exterior facade of the new two-story <br />Target. <br /> <br />The design consists of one elevated parking level <br />constructed of precast concrete and one at-grade parking <br />level, all within a footprint measuring 372 by 252 feet. The <br />elevated precast concrete deck is supported by cast-in- <br />place concrete foundations, while the lower-level parking <br />surface is a concrete slab-on-grade. From the deck's <br />second level, a connecting pedestrian bridge provides <br />access to the store. <br /> <br /> <br />Size: 600 spaces, <br />7.75-acre site <br /> <br />71,;s -r..lr!1el retll,irl!,j 'Hurt! parkil19 :o::poce tlhlll H'd.=" al'ai/al..,le <br />UIl ti'l' properl91 so Kinllcy-llorJl Je~i~ll1l.-'(1 all aJjat'l.-'1l1 IlCU- <br />Il'L".1 f,(//,kiIl9 ;;,,'ilily. <br /> <br />U H G <br /> <br />~-n Kimley-Hom <br />III.....J _ U and Associates, Inc. <br />4-4 <br /> <br />URBAN RESOURCE GROUP <br />