Laserfiche WebLink
<br />I- <br />- <br />I <br />. <br />- <br />. <br />- <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Dean Penny, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com tete one Section E for each ke erson. <br />13. ROLE IN THIS CONTRACT <br />Parking Deck Structural Engineering <br /> <br />14. YEARS EXPERIENCE <br />a, TOTAL b, WITH CURRENT FIRM <br />24 23 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Raleigh, NC <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />Master of Science / Civil Engineering <br />Bachelor of Science / Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />AL / P.E. AR / P.E. AZ / P.E. <br />CA / P.E. FL / P.E. NC / P.E. <br />NV / P.E. SC / P.E. TN / P.E. <br />WV / P.E. VA / P.E. IN / P.E. <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publicalions. Organizations. Traimng. Awards. etc) <br />Offers 24 years of experience specializing in parking planning/design and structural engineering. His design and construction <br />projects have included structural steel, reinforced concrete, precast prestressed concrete, post-tensioned concrete, and timber on all <br />types of buildings, parking decks, and bridges <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED <br /> Target Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Deerfield Beach, FL 2001 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project manager for the Kimley-Horn team that designed an adjacent two-level parking facility for Target. Precast concrete facades were detailed to match the <br /> exterior facade of the new two-story Target. The design consists of one elevated parking level constructed of precast concrete and one at-grade parking level. all <br /> within a footprint measuring 372 by 252 feet. The elevated precast concrete deck is supported by cast-in-place concrete foundations, while the lower-level parking <br /> surface is a concrete slab-on-grade. From the deck's second level, a connecting pedestrian bridge provides access to the store. Precast concrete facades were <br /> detailed to match the store's exterior facade. Cost: $3.25 million. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> Target Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Plantation, FL 2003 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />b. Project engineer on the Kimley-Horn team that provided engineering-related services for the design and construction of a 331-space, two-level (ground plus one <br /> elevated level) parking deck alongside a proposed Target store in Plantation, Florida. The existing Target store on the site was demolished and a new store was <br /> built. The elevated 244 by 227 foot parking deck features precast concrete construction on shallow foundations; the lower level consists of concrete slab-on-grade. <br /> The upper level is accessed via an external express ramp. The deck has been designed to accommodate a potential future elevated level containing another 170 <br /> spaces. Functional design features include orienting the main elevator and stair towers to promote flow into a pedestrian plaza and providing cart storage below the <br /> external express ramp. Cost: $4.5 million. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> Columbia Metropolitan Airport, Parking Structure Planning and PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Functional Design, SC 2003 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project engineer on part of an AlE team. Kimley-Horn provided curbside analyses, parking demand analyses, functional planning, and circulation for a proposed <br /> 2.000-space parking garage to serve long- and short-term parkers. Services included alternative concept development, evaluation of staging during construction, <br /> and providing input into the parking revenue control system. Cost: $24 million. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> North Carolina State University North Campus Parking Deck PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Raleigh, NC <br />d. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal-in-charge of the Kimley-Horn team retained by North Carolina State University to design a two-level, 400-space parking deck on the north campus. The <br /> site. formerly the location of Riddick Stadium, has been used most recently as a surface parking lot. The ongoing rehabilitation, design. and construction of various <br /> buildings on the north campus have created a demand for both new and replacement parking. This new deck will provide parking for campus visitors, as well as <br /> limited staff parking. It also will be designed to accommodate future construction on top of the deck of a four-story building planned for academic use. Cost: $8.5 <br /> million. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> Raleigh Downtown Underground Parking Facility PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Raleigh, NC <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project manager on the Kimley-Horn team that is providing planning. design. and construction phase services for this gOO-space underground parking deck that will <br /> serve the City of Raleigh's proposed new convention center and adjacent hotel. The deck, which will be located under the new hotel, will consist of three parking <br /> levels below grade. Kimley-Horn was responsible for overall design and coordination with the designers of the convention center and hotel. Services provided by <br /> Kimley-Horn include a parking feasibility analysis, structural design, parking consulting, traffic operations. civil engineering. landscape architecture, and overall <br /> project coordination. Cost: $33 million. <br />