My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:35:10 PM
Creation date
11/29/2010 3:34:34 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Faisal Awan <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com Jete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Roadway/Traffic/MOT <br /> <br /> <br />14. YEARS EXPERIENCE <br />a, TOTAL b. WITH CURRENT FIRM <br />5 5 <br /> <br />15. FIRM NAME AND LOCATION (CIty and State) <br />Kimley-Horn and Associates, Inc., Miami, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science / Civil Engineering <br />Master of Science / Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />NH / E.!. <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (PublicatIons. Organizations. Training. Awards, etc.) <br />Experienced in design and preparation of construction plans including roadway geometrics, cross sections, and drainage and <br />grading plans using Geopak and ASAD. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Turnpike Mainline Widening from North of Sunrise Boulevard to PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Atlantic Boulevard 2004 <br /> Broward County, FL <br />a. (3) BRIEF DESCRIPTION (Brief scope, size. cosl. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project included the reconstruction of Florida's Turnpike from North of Sunrise Boulevard to Atlantic Boulevard. Responsibilities included development of drainage <br /> cross sections. ditch profiles, and various other drainage activities. Cost: $82 million. <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Venetian Causeway Streetscape Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Miami-Dade County, FL <br />b. (3) BRIEF DESCRIPTION (Bnef scope, sIze. cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project engineer on the team responsible for the professional services, master planning and the preparation of complete plans for the beautification of the Historic <br /> Venetian Causeway. Kimley-Horn was responsible for developing vertical and horizontal alignments, coordinating drainage design and signing and pavement <br /> markings, landscape/hardscape/irrigation and signalization plans for this corridor. The project includes extensive coordination with the City of Miami and the City of <br /> Miami Beach. It also required an involved public involvement program. Cost: TBD. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 710 (Beeline Highway) from Military Trail to Congress Avenue PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> (Project A) <br /> Palm Beach County, FL <br />c. <br /> (3) BRIEF DESCRIPTION (Brief scope, Size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design engineer responsible for assisting in horizontal and vertical design of roadway, drainage design, and development of traffic control plans. The project <br /> included the addition of two new lanes to provide a four-lane divided urban section as well as the removal of the existing two-lane bridge and the construction of a <br /> new two-lane parallel bridge in its place. Cost: $29 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 710 (Beeline Highway) from West of Congress Avenue to West PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> of Australian Avenue (Project B) <br /> Palm Beach County, FL <br />d. <br /> (3) BRIEF DESCRIPTION (Brief scope, Size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design engineer responsible for assisting in development of horizontal and vertical alignment of the roadway. The project consists of the addition of two new lanes <br /> to provide a four-lane divided urban section. Cost: TBD. <br /> (1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED <br /> NE 2nd Avenue Reconstruction from NE 91st Street to NE 105th PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Street <br /> Miami, FL <br />e. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Design engineer responsible for developing vertical and horizontal alignments, providing drainage design. signing and pavement markings. and signalization plans <br /> for this corridor. The project included the reconstruction/widening of NE 2nd Avenue from NE 94th Street to NE 103rd Street, as well as areas of roadway milling <br /> and resurfacing at the beginning and end of the project. The project also included a Joint Participation Agreement with the Village of Miami Shores, in which the <br /> Village agreed to fund the streetscape and landscape improvements in order to participate in their design. Cost: $6 million. <br />
The URL can be used to link to this page
Your browser does not support the video tag.