My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:35:10 PM
Creation date
11/29/2010 3:34:34 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Burt Baldo, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Roadway/Traffic/MOT <br /> <br />14. YEARS EXPERIENCE <br />a, TOTAL I b. WITH CURRENT FIRM <br />14 8 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., Miami, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />Bachelor of Science / Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND D/SCIPLlNE) <br />FL/ P.E. <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. OrganizatIons. Traming. Awards. etc) <br />More than 14 years experience in civil engineering with more than 12 years of extensive experience in the field of highway design, <br />drainage design, and traffic operations plans. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (Cdy and State) (2) YEAR COMPLETED <br /> SR 80 from West of Haverhill Road to East of 1-95 PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> West Palm Beach, FL <br />a. (3) BRIEF DESCRIPTION (Bnefscope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Lead engineer/assistant project manager for team providing the complex engineering design services for SR 80 from west of Haverhill Road to east of Kirk Road. <br /> The project was designed with eight lanes and a grade-separated interchange at Military Trail and Haverhill Road. Program included five bridges with retaining walls <br /> and a 2,500-foot bulkhead along the north side of the C-51 Canal. Cost: $120 million. <br /> (1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED <br /> SW 216th Street from SW 127 Ave. to Florida's Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If Applicabte) <br /> Miami, FL <br />b. (3) BRIEF DESCRIPTION (Bnef scope, size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Project manager responsible for the master planning, public involvement, developing vertical and horizontal alignments, signing and pavement markings and <br /> signalization plans for this 1.25-mile corridor. Also responsible for coordination for drainage design, which was performed by a subconsultant. Cost: $14 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-4 Widening from South of Kirkman Road to South of Orange PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Blossom Trail 2007 <br /> Orlando, FL <br />c. (3) BRIEF DESCRIPTION (Brief scope. sIze. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Project engineer responsible for the variation package, design of the super-elevation transitions, and the quality control of the horizontal and vertical alignments. <br /> Services included 60 percent roadway plans. BDRs, and traffic operations plans. Project also included the design of two interchanges. Responsibilities included the <br /> QC of the horizontal and vertical alignments. Designed the superelevation transitions. Also responsible for the variation package. Cost: $5 million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 710/Beeline Highway Design (East and West) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Palm Beach County, FL <br />d. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Project manager for three new construction/widening projects. The combined length of all projects is 5.33 miles. Project manager for the design team provides major <br /> highway design services. The western project (Project A) consists of the addition of two new lanes to provide a four-lane divided urban section along with the <br /> replacement of the existing two-lane bridge and construction of a new two-lane parallel bridge. The eastern projects (Projects B and C) will provide a four-lane <br /> divided urban highway. These projects include extensive right-of-way acquisition and coordination with local government. Cost: $29 million. <br /> (1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED <br /> Traffic Analysis for Nine Intersections PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Miami-Dade County, FL 2006 <br />e. (3) BRIEF DESCRIPTION (Bnef scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Project manager for traffic operational analyses that were performed for MDPWD as part of the short-term traffic solutions effort for the County's list of congested <br /> intersections. During the last quarter of 2005, the County issued a list of 25 intersections and suggested modifications to those intersections. Toward the end of the <br /> year, the County assigned nine of the intersections to Kimley-Horn that were within FOOT right-of-way. The County asked that we perform traffic analyses and <br /> confirm the suggested modifications within a month (a very accelerated schedule). We completed the task in January 2006 and held meetings with FOOT. who <br /> approved the concepts. We also worked on the design of several of these intersections. Cost: $66.000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.