Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Ted Kendziora <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Environmental <br /> <br /> <br />14. YEARS EXPERIENCE <br />a, TOTAL b, WITH CURRENT FIRM <br />5 3 <br /> <br />15. FIRM NAME AND LOCATION (CIty and Slate) <br />Kimley-Horn and Associates, Inc., Port St. Lucie, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science I Wildlife and Fisheries Biology <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (PublIcatIOns, Organizallons, Training. Awards. etc) <br />More than two years of experience of regulatory permitting for the Department of Environmental Resources Management (DERM), <br />Coastal Resources Section, Miami-Dade County, and coordinating environmental permits with the U.S. Army Corps of Engineers, <br />Florida Department of Environmental Protection, and the South Florida Water Management District. As well as more than three <br />years of experience of wildlife trapping, tagging, data collection, and relocation. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Boynton Beach CRA Mangrove Mitigation Monitoring PROFESSIONAL SERVICES CONSTRUCTION (/1 Applicable) <br /> Boynton Beach, Fl 2006 <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project manager for the Kimley-Horn team who was involved with the permitting for the expansion of Boynton Beach Boulevard and the Promenade. as well as <br /> providing environmental services for the related impacts to natural resources associated with the project and the creation of tidal wetland mitigation area. As the <br />a. environmental scientists for the project, the firm obtained the required regulatory approvals for the multi-phased community redevelopment project by coordinating <br /> with the SFWMD and USACE regarding wetland delineation and endangered and threatened species. seagrass surveys, WRAP analysis, and mitigation <br /> requirements. Kimley-Horn assisted the Boynton Beach CRA with environmental services related to a mitigation area created at the Boynton Beach Boulevard <br /> Extension and Promenade area and Jaycee Park. The firm assisted with information leading to the creation of the mitigation area and the monitoring requirements <br /> throughout the project's history. Kimley-Horn's environmental staff documented and obtained enough information on the project to complete the phase zero <br /> monitoring report and to keep in compliance with the current monitoring schedule. The project had its share of difficulties including numerous agency reviewers and <br /> the 2004 hurricane season. The 2004 hurricane season resulted in disturbing the mitigation site at Jaycee Park and thus the planting requirements in the permit <br /> were not consistent with the permit requirements. Kimley-Horn coordinated with SFWMD and USACE. Cost $14,500. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sian PROFESSIONAL SERVICES <br /> Hollywood,Fl 2006 <br />b. (3) BRIEF DESCRIPTION (Briel scope. sIZe. cosl. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Served as analyst for the land development of this beach-side resort. Tasks included cut / fill calculations, impervious / pervious area calculations. and grading <br /> analysis. Cost: $90,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sunset Beach PROFESSIONAL SERVICES CONSTRUCTION (If ApplIcable) <br /> St. Lucie County, Fl <br />c. (3) BRIEF DESCRIPTION (Briel scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Environmental scientist. Kimley-Horn prepared the ERP permit application and the Coastal Construction Control Line permit application for this single-family <br /> residential oceanfront development. The firm is currently coordinating with the Florida Fish and Wildlife Conservation Commission, the U.S. Fish and Wildlife <br /> Service, the U.S. Army Corps of Engineers, the National Marine Fisheries Service, and St. Lucie County. Kimley-Horn also prepared the Environmental Impact <br /> Report and the Planned Unit Development package for St. Lucie County and are currently in the development review process. Cost: $550,660. <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Flamingo, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Miami Beach, Fl 2007 <br />d. (3) BRIEF DESCRIPTION (Bnel scope. sIZe. cosl. etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br /> Conducted a marine resource assessment via SCUBA to identify regulated resources in Biscayne Bay Aquatic Preserve. Prepared a Marine Resource Assessment <br /> Report to be submitted as part of the Environmental Resource Permitting process. Cost: $ $9,550 (sea grass survey). <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Mondrian South Beach PROFESSIONAL SERVICES <br /> Miami Beach, Fl 2007 <br />e. (3) BRIEF DESCRIPTION (Bnelscope. Size, cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Served as an analyst for the renovation of an existing structure. Tasks included redevelopment of pool deck and associated grading, design of a new drainage <br /> systems, and preparation of construction documents. Cost: $134,430. <br />