My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Kimley-Horn & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Kimley-Horn & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:35:10 PM
Creation date
11/29/2010 3:34:34 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />Jamie Farnham, E.!. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Parking Deck Structural Engineering <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />4 4 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Kimley-Horn and Associates, Inc., West Palm Beach, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />Bachelor of Science / Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL / E.1. <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards. etc.) <br />Engineering design software experience with MicroStation, GeoPak, GeoPak Bridge. <br />Bridge design software experience with RC Pier, GT Strudl, Merlin-Dash, Shoring Suite FDOT Software, ConS pan LA. and Win- <br />Descus I & II. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> US 41 (Business)/SR 739 - South of Alico Road to Six Mile Cypress PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Parkway 2007 <br /> Lee County, FL <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Responsible for structural modeling and design of 72" Florida Bulb- T and AASHTO Type IV prestressed girder dapped ends. Responsible for bulkhead and <br /> retaining wall geometric layout and design as well as multiple bridge substructure designs. Cost: $1.1 million. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> Turnpike Mainline Widening from North of Sunrise Boulevard to PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Atlantic Boulevard 2004 <br /> Broward County, FL <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> As project analyst, responsible for bulkhead and retaining wall geometric layout and design. as well as multiple bridge substructure designs for this 6,5-mile <br /> widening project in Broward County. This project is a fast paced combination of PD&E and design phases that includes the widening of the Florida's Turnpike from <br /> six to eight lanes, three bridge widenings. two bridge replacements. and toll plaza modifications. Cost: $82 million. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> 1-4 Widening from South of Kirkman Road to South of Orange PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Blossom Trail <br /> Orlando, FL <br />c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Served as analyst and performed multiple bridge alternative studies, as well as development reports for nine new bridges and three widenings. This project includes <br /> reconstruction of approximately 5.3 miles of the existing six-lane expressway to six general use lanes and two special use lanes. In addition, existing structures, <br /> interchange ramps, and side roads will be modified to accommodate the proposed section. The interchange at Kirkman Road will be replaced with a partial access <br /> multi-level directional interchange with one loop ramp. Within the project limits there are also interchanges with Republic Drive, Florida's Turnpike, Conroy Road, <br /> and John Young Parkway. Cost: $5 million <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> SR 739 over Alico Road/Seminole Gulf RR (US 41 Business) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> FOOT District One 2005 <br />d. (3) BRIEF DESCRIPTION (Bnef scope. size, cost, elc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Responsible for structural modeling and design of 72" Florida Bulb-T and AASHTO Type IV prestressed girder dapped ends. Responsible for bulkhead and <br /> retaining wall geometric layout and design as well as multiple bridge substructure designs. Cost: $1.1 million. <br /> (1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED <br /> NW 25th Street Viaduct over NW 25th Street PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> Miami-Dade County, FL <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Responsible for multiple-span bridge geometric layout and design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.