Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />John McWilliams, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lele one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Traffic Engineering <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />7 7 <br /> <br />15. FIRM NAME AND LOCATION (CIty and State) <br />Kimley-Horn and Associates, Inc., Fort Lauderdale, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br />Bachelor of Science / Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />FL / P.E. <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (PublIcations, Organizations, Training. Awards, etc.) <br />Has expertise in traffic operations and design, transportation planning, and highway design, IMSA Certification in Work Zone Safety <br />and Traffic Signal Technician Levell. Also proficient in AutoCAD R14, Microstation, Highway Capacity Software, Synchro, ART- <br />PLAN, HIGH-PLAN. <br /> <br /> (1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED <br /> Omni Development PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Miami, FL <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [XI Check if project performed with current firm <br />a. Project engineer for redevelopment of this 11.3-acre site adjacent to Miami's Carnival Center for the Performing Arts. Composed of six, 58-65 story residential <br /> towers offering 4,200 dwelling units and 350,000 square feet of retail. this site is poised to become the area's major retail/residential center. Responsibilities <br /> included master planning, urban design concepts. landscape architecture, and coordination with the Florida Department of Transportation and the city on a year <br /> long and ultimately unanimous public approvals process. Also worked with the city and the Omni CRA to re-establish the city's street grid. This plan divides the <br /> existing super block into three smaller blocks with NE 16th and 17th Streets once again linking Biscayne Boulevard to Margaret Pace Park and the proposed <br /> Baywalk. The new section of NE 17th Street will become an enhanced pedestrian/auto retail corridor with outdoor spaces for gatherings. Cost: $8.5 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Terrazas RiverPark Village PROFESSIONAL SERVICES I CONSTRUCTION (If ApplIcable) <br /> Miami, FL <br />b. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE [XI Check if project performed with current firm <br /> Project engineer for a Major Use Special Permit (MUSP) traffic analysis for a 320-unit high-rise condominium located in the City of Miami. Analysis included the <br /> examination corridors by person-trip capacity, including transit ridership and study intersection capacity analysis. Cost: $83,250. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Empire World Towers PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Miami, FL <br />c. (3) BRIEF DESCRIPTION (Briefscope. sIze. cost, etc.) AND SPECIFIC ROLE [XI Check if project performed with current firm <br /> Task manager for traffic analysis located on this two-acre parcel in downtown Miami. Designed by Kobi Karp Architects, Empire World Towers, if built. will be the <br /> tallest towers and condominium in Miami and will consist of two 70- to 80-story buildings. Kimley-Horn's services include landscape architecture and urban design of <br /> the ground floor and upper-level amenity decks, vehicle access and traffic analysis, and civil engineering due diligence for the Major Use Special Permit process. <br /> Cost: $44,460. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Districtwide Traffic Operations Safety Studies PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Miami, FL 2003 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Responsible for conducting qualitative assessments. safety, and operational analyses, and corridor studies. Work included data collection, field assessments, <br /> capacity analyses. and the development of safety improvements. Total project cost: $280,000. <br /> (1) TITLE AND LOCATION (CIty and State) (2) YEAR COMPLETED <br /> Infinity at Brickell (Infinity I and II) PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Miami, FL <br /> (3) BRIEF DESCRIPTION (Brief scope, SIze, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />e. As project analyst. performed all of the geometric analysis for this project. Phase I responsibilities included a parking garage geometric/traffic circulation review to <br /> determine areas of potential conflict between vehicular movements and structural elements. Analysis also examined turning radii at ramp locations. A conceptual <br /> parking control plan, which examined the methods of separating different parking user groups throughout the garage using nesting techniques, was also performed. <br /> Other responsibilities for Phase I included the preparation of brief functional descriptions of nesting operations and recommendations regarding access control <br /> technologies. Phase II responsibilities included a parking garage geometric/traffic circulation review to determine areas of potential conflict. Phase II analysis also <br /> included the vehicular operations in the loading areas, which involved an examination of the required height for refuse vehicles in the loading area. Cost: $274,066. <br /> <br />19. RELEVANT PROJECTS <br />