Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />12. NAME <br />ALFREDO BUDIK, r.E, <br /> <br />E. RESUMES OF KEY PERSONNEL. PROPOSED FOR THIS CONTRACT <br />Com lele one Section E for each ke arson. <br />13. ROLE IN THIS CONTRACT <br />PROJECT MANAGER <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br /> <br />20 <br /> <br />17 <br /> <br />15. FIRM NAME AND LOCATION (City and Stale) <br />BUREAU VERITAS NORTH AMERICA, INC. - MIAMI, FLORIDA <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />BSCE - CIVIL ENGINEER <br />MSCE - GEOTECHNICAL ENGINEER <br /> <br />PROFESSIONAL ENGINEER - FLORIDA <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Traimng. Awards, elC) <br />PROFESSIONAL ENGINEER LICENSED IN FLORIDA, AMERICAN SOCIETY OF CIVIL ENGINEERS, NATIONAL SOCIETY OF <br />PROFESSIONAL ENGINEERS, FLORIDA ENGINEERING SOCIETY, AMERICAN CONCRETE INSTITUTE AND DEEP <br />FOUNDATION INSTITUTION <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (tl Applicable) <br /> METRO RAIL NORTH CORRIDOR EXTENSION <br /> MIAMI, FLORIDA 2006 2014 (projected) <br />a. (3) BRIEF DESCRIPTION (Briel scope. size, cosl. e/c) AND SPECIFIC ROLE [X ] Check if project performed with current firm <br /> PROJECT MANAGER FOR THE SUBSURFACE EXPLORATION OF OVER 150 BORINGS TO 100 FEET DEEP AND 40 <br /> PERCOLATION TESTS - PROJECT COST ESTIMATED AT $800,000,000.00. <br /> (1) TITLE AND LOCA TtON (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (il Applicable) <br /> CAPRI SOUTH BEACH, MIAMI, FLORIDA <br /> 2005 2007 <br />b, (3) BRIEF DESCRIPTION (Briel scope, size, cost. e/c) AND SPECIFIC ROLE [X] Check jf project performed with current firm <br /> TWO MID-SIZE CONDOMINIUM STRUCTURES ABOVE AN UNDERGROUND PARKING GARAGE FOR 400 VEHICLES. <br /> SUBSURFACE EXPLORATION AND FOUNDATION RECOMMENDATIONS - PROJECT COST: $40,000,000.00. <br /> (1) TITLE AND LOCATION (Ciry and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br /> PINNACLE PARK, MIAMI, FLORIDA 2005 <br /> 2007 <br />C. (3) BRIEF DESCRIPTION (Briel scope. size, cost, e/c) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> 16-STORY APARTMENT BUILDING AND 9-STORY ADJACENT PARKING GARAGE. THE APARTMENT BUILDING WAS <br /> FOUNDED ON AUGERCAST PILES AND THE PARKING GARAGE ON A SHALLOW FOUNDATION AFTER VIBRO- <br /> FLOTATION SITE IMPROVEMENTS. PILE LOADING TESTS, SUBSURFACE EXPLORATION AND GEOTECHNICAL <br /> RECOMMENDA TIONS - PROJECT COST: $35,000,000.00. <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> PROFESSIONAL BUILDING, MIAMI, FLORIDA <br /> 2006 2007 <br />d. (3) BRIEF DESCRIPTION (Brief scope. Size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> IO-STORY OFFICE BUILDING AND A DETACHED 10-STORY PARKING GARAGE. SUBSURFACE EXPLORATION AND <br /> FOUNDATION RECOMMENDATIONS FOR AUGERCAST PILES AND LOADING TESTS - PROJECT COST: $50,000,000.00. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (II Applicable) <br /> TREE ISLAND PARK AND PRESERVE, MIAMI, FLORIDA 2007 <br /> 2008 (projected) <br />e. (3) BRIEF DESCRIPTION (Briel scope. size, cost, etc) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> PERCOLATION TESTS THROUGHOUT THE PROPOSED PARK FOR DRAINAGE DESIGN. <br /> PROFESSIONAL COST: $16,000.00. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />