Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12. NAME 13. ROLE IN THIS CONTRACT <br />Robert Zuccaro, PE Project Manager <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />URS Corporation, Boca Raton, FL <br />16, EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />BS, Civil Engineering FL, Civil Engineering PE # 17931 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Civil Engineers, Florida Engineering Society, Professional Engineers In Private Practice, <br />Florida Institute of Consulting Engineers, Who's Who in Civil Engineering (1973) <br /> <br />19. RELEVANT PROJECTS <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL: 38 b. CURRENT FIRM:3.5 <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: CivillOngoing applicable): <br /> <br />a. (3) BRIEF DESCRIPTION AND SPECIFIC ROLE [ZJ Check if project performed with current firm <br />Role. Project Manager. Modification of site civil utilities due to lack of as-built information during construction. <br />Coordination closely with the contractor, client, architect and regulatory agencies, <br /> <br />(1) TITLE AND LOCATION (City and State) <br />FlU, Wolf Univeristy Expansion, Miami, FL <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Borland Center for Enrichment (Mixed Use), Palm <br />Beach,FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: Civil/Ongoing applicable): <br /> <br />b. ~ <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE ~ Check if project perfonned with current firm <br />Role. Project Manager. Coordinated complete site civil design effort including platting, permitting and <br />construction phase services, <br /> <br />1) TITLE AND LOCATION (City and State) <br />Kravis Center, West Palm Beach, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: Civil/2006 applicable): <br />c. ~ <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Role. Project Manager. Coordinated complete site civil utility design efforts including permitting, <br />construction phase services and final certifications, <br /> <br />1) TITLE AND LOCATION (City and State) <br />Palm Beach County Fire Training Facility, Palm Beach <br />County, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: Civil/Ongoing applicable): <br /> <br />d. (3) BRIEF DESCRIPTION AND SPECIFIC ROLE [ZJ Check if project performed with current firm <br />Role. Project Manager. Coordinated complete site civil design, including complex storm water management <br />system of Fire Training Facility site and off-site canal modifications to meet regulatory requirements. <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: Civil 12005 applicable): <br /> <br />e. (3) BRIEF DESCRIPTION AND SPECIFIC ROLE [ZJ Check if project performed with current firm <br />Role. Project Manager. Coordinated complete site civil utility design efforts including permitting, construction <br />phase services and final certifications. <br /> <br />1) TITLE AND LOCATION (City and State) <br />Marriott Ocean Pointe, West Palm Beach, FL <br /> <br />f. <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: Civil/Ongoing applicable): <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE [ZJ Check if project performed with current firm <br />Role. Project Manager for a 194 acre mixed-use development in North Miami, Flroida. This is a current on- <br />going project (anticipated 10-12 year buildout). Task assignments included the prepartion of over-all <br />aerial/topographic map for the entire 194 acres; overall project master water plan, master sewer plan, master <br />cut/fill analysis and master grading plan; traffic analysis for entire project to establish on-site and off-site <br />roadway lane requirement; roadway design including signalized intersections, improvements to US I (Biscayne <br />Blvd,) to support projected traffic volumes, complete site civil design, permitting and construction <br /> <br />1) TITLE AND LOCATION (City and State) <br />Biscayne Landing, North Miami Beach, FL <br /> <br />URS <br />