My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Architects International
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Architects International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:44:53 PM
Creation date
11/29/2010 3:44:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12, NAME <br />WiI Wright, PE <br /> <br />13. ROLE IN THIS CONTRACT <br />Electrical Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL:24 b, CURRENT FIRM: 6 <br /> <br />15, FIRM NAME AND LOCATION (City and State) <br />URS Corporation, Boca Raton, FL <br />16. EDUCATION (Degree and Specialization) <br />BS, Electrical Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Florida, Electrical Eng PE #64168 <br />Louisiana, Electrical Eng PE #31208 <br />Arizona, Electrical Eng PE # 10537 <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Member of IEEE <br /> <br />19. RELEVANT PROJECTS <br /> <br />Design Completed 2005 <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: applicable): <br />ElectricallOngoing <br />a, ~ <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Role. ST A5-3 SFWMD electrical design-provided detail checking of the electrical design. , <br />Cost:$600,000 construction costs <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Lift Station No.9, Wilton Manors, FL <br /> <br />(1) TITLE AND LOCATION (City and State) <br />STA 5-3 SFWMD Project, Hendry County, Fla. <br /> <br />Design Completed 2006 <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: applicable): <br />Electrical/Ongoing <br /> <br />b, (3) BRIEF DESCRIPTION AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Role. Assisted the electrical engineer in field checking the existing facilitiy and verifYing the modified design <br />before issuing to the Client. <br /> <br />Cost: $10,000 electrical fee only. <br /> <br />1) TITLE AND LOCATION (City and State) <br />Roker Point, Exuma, Bahamas <br /> <br />Design Completed 2006 <br /> <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: applicable): <br />ElectrlcallOngoing <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE ~ Check if project performed with current firm <br />C. <br />Role. Assisted the electrical engineer in design of the subdivision 15kV system including cable routing, one <br /> <br />line, protection equipment and ductbank design. I also provided the detail checking for the final design, <br /> <br />Cost:$1.5million construction costs <br /> <br />d. <br /> <br />Design Completed 2006 <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: applicable): <br />Electrical/Ongoing <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Role. STA 6-2 SFWMD electrical design-provided all of the electrical design for the 13kV primary distribution <br />grid including cable, transfonners, generation and protection, This involved producing the one line, layouts and <br />all other electrical drawings <br /> <br />1) TITLE AND LOCATION (City and State) <br />SFWMD STA 6-2 Pilot Project, Hendry County, Fla. <br /> <br />Cost:Estim for Electrical construction only, $2million. <br /> <br />1) TITLE AND LOCATION (City and State) <br />Cytec Chemical Plant Perimeter Lighting, NO, LA <br /> <br />Design Completed 2006 <br /> <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: Electrical applicable): <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Role. Rebuild the 2.3mile perimeter lighting for the Cytec Chemical Plant in Louisiana, Replacing 53 fixtures <br />e. <br />and poles and converting to a 480V 3 phase system. This design required 4 sources and a lighting analysis to <br />complete. The GE ALADAN software was used for the study. This job is scheduled for construction in 2007, <br /> <br />Cost:Construction estimate about $1,000K <br /> <br />URS <br />
The URL can be used to link to this page
Your browser does not support the video tag.