Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12. NAME 13. ROLE IN THIS CONTRACT <br />Dale Wiley, PE Mechanical Engineer <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />URS Corporation, Boca Raton, FL <br /> <br />16. EDUCATION (Degree and Specialization) <br />Masters in Business Administration, University of <br />Wisconsin-Oshkosh, 1985 <br />Bachelor of Science in Mechanical Engineering, <br />Milwaukee School of Engineering, 1977 <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL: 29 b, CURRENT FIRM: 1 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FLlMechanical PE #64469 <br />WIIMechanical PE #21043, MI/Mechanical PE #5178534, <br />ME/Mechanical PE #9811, P A/Mechanical PE #055977E, <br />and Project Management ProfessionaIlPMP#274277 <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) <br />Member of American Society of Mechanical Engineers (ASME) <br /> <br />19. RELEVANT PROJECTS <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: 2007 applicable): 2007 <br /> <br />(3) BRIEF DESCRIPTiON AND SPECIFIC ROLE [8J Check if project performed with current firm <br />Role. Mechanical and electrical design leader for the electrical and mechanical design engineering for the South <br />a. Florida Water Management District Stormwater and Everglades restoration projects. Completed a feasibility <br />study of power options, and then proceeded to design and construction of an isolated interim underground <br />distribution power system with LP gas electric generators (Power Pilot Project) for the ST A 6 Section 2 and <br />ST A 6 Section 1 enhancements projects. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />SFWMD - ST A 6-2 Power Pilot Project, Hendry County, FL <br /> <br />Cost:engineering fees = $305,000 <br />(1) TITLE AND LOCATION (City and State) <br />Oneida Casino Emergency Diesel Generators, Green Bay, WI <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: 1995 applicable): 1995 <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE 0 Check if project performed with current firm <br />b. Role. Power plant design engineer and project manager for the design and construction of a new 2,0 MW <br />Casino Emergency Diesel Generators. <br /> <br />Cost: $1.2 million <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: 1999 applicable): 1999 <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE 0 Check if project performed with current firm <br />Role. Power plant design engineer and project manager for the design and construction of a new Victoria Hydro <br />c. 6050' Penstock Replacement. <br /> <br />1) TITLE AND LOCATION (City and State) <br />Hydro Power Plant Penstock Replacement, Victoria, MI <br /> <br />Cost: $6 million <br /> <br />1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION(if <br />SERVICES: applicable): <br /> <br />o Check if project performed with current firm <br /> <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE <br />d. Role. <br /> <br />Cost: <br /> <br />URS <br />