Laserfiche WebLink
<br />~Il <br />.A - :r::::>. .A <br />IDIJ.:'(e1I....IDI::Mr.. .~~I"" <br /> <br />12,. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />Com lete one Section E for each ke <br />13, ROLE IN THIS CONTRACT <br /> <br /> <br />Brent Whitfield, PE, CFM <br /> <br />ProjecfManager <br /> <br />A TOTAL <br />4 <br /> <br />14. YEARS EXPERIENCE <br />B. WITH CURRENT FIRM <br /> <br />2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />A.D.A. En ineerin ,Inc. Tam a, Florida <br />16. EDUCATION (Degree and SpeCialization) <br />Master of Science - Civil Engineering <br />Bachelor of Science - Civil En ineerin <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizati6ns, Training, Awa1]is, etc.) <br />Member - Arner.ican Society of C.v.!I...... Fpgineers (~SCE); Am~~i.can Water Resources Association (AWRA); <br />Association of State Floodplai agers; Chi Epsilon' Civil Engineering Honor Society; Florida Engineering <br />Society; Treasure Coast Chapter; ional Society ()f Profession~rErigineers; C~rtifications - Certified Floodplain <br />Manager (CFM); Skills - XP-SWMM, HEC-RAS, MIKE-SHE, AdICPR, ArcGIS, ArcHydro, AutoCAD, Microsoft Office <br />and Campbell Scientific Instrumentation <br /> <br />17. CURRENTPROFESSIONAL REGISTRATION {State and Discipline) <br />Florida - ProfessiQrjalEngineer <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> C-139 Basin Phosphorus Water Quality and Hydrology PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Analysis - South Florida Water Management District 2006 N/A <br /> (SFWMD) / West Palm Beach, Florida <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> As Lead Project Engineer, Mr. Whitfield developed a comprehensive dataset defining the hydrologic and hydraulic <br /> characteristics of the 170,000 acre C-139 Basin in Hendry County, Florida. Future phases of the project include a <br /> screening level phosphorus assessment of the current water quality conditions and recommendation of monitoring <br /> station locations, Professional Fee $193,754. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Analysis of Recommended Primary System Flood Mitigation PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Projects for the Miami River Watershed - South Florida <br /> Water Management District and Department of Community 2005 N/A <br /> Affairs / West Palm Beach, Florida <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> As Lead Project Engineer, Mr. Whitfield developed a hydrologic and hydraulic model of the C-6 and C-2 Canals for <br /> integration with the existing hydrologic and hydraulic models of the C-4 and C-3 Canals, He also prepared model <br /> parameters to represent land use, infiltration, runoff, canal cross-sections, control structures, and bridges for <br /> development of existing and future hydrologic and hydraulic models, Professional fee $80,000, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Design and Support Service for C-1 Canal Bank Stabilization PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> - SFWMD I West Palm Beach, Florida 2005 N/A <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> As Project Engineer, he developed a set of design alternatives to stabilize 1300 feet of eroded bank along the C-1 <br /> Canal in Homestead, Florida. The project included the production of construction plans and technical specifications <br /> for the client-chosen alternative, as well as the procurement of environmental permits. Professional fee $70,000, <br /> Estimated construction cost is $750,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Central Miami-Dade County Watershed Planning, C-4 Basin PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Project - Phase II - Miami-Dade County Department of <br /> Environmental Resources Management (DERM) I Miami-Dade 2004 N/A <br />d. County, Florida <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> As Project Engineer, Mr. Whitfield utilized GIS and other applications to prepare model parameters to represent land <br /> use, infiltration, runoff, canal cross-sections, control structures, and bridges for development of existing and future <br /> conditions hydrologic and hydraulic models. Professional fee $250,000. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />