|
<br />~Il
<br />
<br />A-D-A
<br />1::M~IC'1'~13II::Mf'''.~['''''
<br />
<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />
<br />Com fete one SectiodE for eachke
<br />13. ROLE IN THIS CONTRACT
<br />
<br />
<br />A.TOTAL
<br />9
<br />
<br />14, YEARS EXPERIENCE
<br />B. WITH CURRENT FIRM
<br />
<br />Albert Argudin, Jr., CGC
<br />
<br />Constructjpn Manager
<br />
<br />8
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />A.D.A. Engineerin, Inc. (Miami, Florida)
<br />16. EDUCATION (Degree and Specialization)
<br />Masters of Science - qonstructionManagement
<br />Bachelor of Science - ESS
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training; Awards, etc,)
<br />Certifications -Adv~.~c~d Workzone Traffic qpntrol (FqpT);Asphalt.P~"ingLevell (CrQP); Asphalt Paving Level II
<br />(CTQP); QC Ma~.ager (CTQP); Mic~~H~omputer AidedCo~~ Estil11~ting Second Generation (Mil); Primavera P3E
<br />Skills - Windows 9X12000/XP, Micrpsoft Office Suite, Work Shops - FOOT CEIProject Management; Asphalt
<br />Inspection
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Florida -Certified General Contractor
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Traz Powell Stadium Synthetic Turf Project - Miami Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Count Public Schools (MDCPS) 2007 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm
<br />a.
<br /> The project included the replacement of the sod field with a new synthetic turf system, new drainage system, relocation
<br /> of the Track & Field activities, a new camera system for the track events and minor electrical improvements. Mr.
<br /> Argudin is the Construction Manager responsible for oversight of the project and supervision of ADA's Resident
<br /> Inspector. As part of its Construction Management services, ADA is also responsible for reviewing the contractor's
<br /> month Iv schedule updates for comDliance with the contract documents,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Curtis Park Synthetic Turf Project - City of Miami PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2007 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm
<br />b. ADA was selected by the City of Miami to provide design and construction management services, The project includes
<br /> . the replacement of the sod field with a new synthetic turf system, new drainage system, relocation of the Track & Field
<br /> activities, minor electrical improvements. Mr. Argudin is the Construction Manager responsible for oversight of the
<br /> project and supervision of ADA's Resident Inspector. As part of its Construction Management services, ADA is also
<br /> responsible for reviewing the contractor's monthly schedule updates for compliance with the contract documents,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Michael Krop Senior High School - Playfield Restoration - PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Miami, Florida 2006 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm
<br />c. Mr, Argudin was the Office Engineer for the FEMA DORM Master Consultant project. The project consisted of
<br /> countywide roadway reconstruction, roadway resurfacing and drainage improvements, Upon completion of the project,
<br /> Mr. Argudin and the Construction Engineering Inspection (CEI) team had managed approximately $40 million dollars in
<br /> construction costs, Those costs were reflected in over 125,000 LF of drainage and over 300,000 SY of roadway
<br /> improvements to some of the County's vital corridors such as; NW 22nd Avenue; Ives Dairy Road; North Miami
<br /> Avenue; SW 32nd Street and NE 2nd Avenue.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> 97f11 Avenue from S.W. 72nd Street to S.W. 40tn Street Master PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Planning and Roadway Improvements - Miami-Dade County Ongoing Ongoing
<br />d. Public Works Department (MDCPW) I Miami, Florida
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Mr. Argudin assisted with this 2-mile roadway improvement project which includes drainage, roadway design,
<br /> maintenance of traffic, street lighting and signalization, The work includes development of alternative roadway sections
<br /> and participation in public hearinas as public involvement. Professional fee $295,000.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|