Laserfiche WebLink
<br />~Il <br /> <br />A..L).A. <br />.ar.:"[eJIl~I:MDI~41"'[et <br /> <br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROeOSED FOR THIS CONTRACT <br /> <br />Com lete one Section E foi'each ke <br />13. ROLE IN THIS CONTRACT <br /> <br /> <br />Alberto D. Argudin, PE, CGC <br /> <br />Quality Ass~rance r QuaUty Control <br /> <br />A TOTAL <br />31 <br /> <br />14. YEARS EXPERIENCE <br />B. WITH CURRENT FIRM <br />26 <br /> <br />15. FIRM. NAME AND lOCATION (City and State) <br />A.D.A.En ineerin'~.Jnc. (Miami, Florida) <br />16., EDUCATION (Degree and Specialization) <br />Bachelor of Scieilpe.-::: Civil Engilleering <br /> <br />17. CURRENT PROFES$10NAl REGISTRATION (State and Discipline) <br />Florida - Professional Engineer; Puerto Rico - <br />Professignal Engineer; Florida - State Certified <br />Contractor; Florida - Certified General Contractor <br />18, OTHER PROFES$IQNAF QUALIFICATIONS (Publications. Organizatjbns:Tr~injng;Awacg~!etc.) <br />Member:-> FI~,rida Engineering SOfi~ty (Miami Cha~~~r Director); American Society of Civil Engineers (Fell~w); <br />American ConsultingEnginee~Council;Cuban ~merif~~. Engi~~~ringSociety; National Society of .~rofessi~nal <br />Engineers; Puerto!;;Rico College of Engineers & Surveyors AWClrds - Miami Dade College Hall of Fame Inductee <br />(Engineering) <br /> <br />19; RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Countess de Hoernle Park - MEP Engineering Services PROFESSIONAL SERVICES CONSTRUCTION (If appl;cable) <br /> Boca Raton, Florida Ongoing Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />a. Mr, Argudin is the Principal-in-Charge on the Countess de Hoernle Park Mechanical, Electrical and Plumbing (MEP) <br /> Engineering Services contract. ADA is providing the MEP design of the Phase 1 Master Plan components for the <br /> southern parcel to satisfy the City's immediate need for softball/baseball and soccer playing fields, while being <br /> environmentally and culturally innovative, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Traz Powell Stadium Synthetic Turf Project - Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2006 Ongoing <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Mr, Argudin was the Principal-in-Charge for this project which included the Civil Design services for the replacement <br /> of playfield grass, as well as the coordination of Lighting, Drainage and Construction Management. Estimated Cost: <br /> $1000,00, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Curtis Park Synthetic Turf Project - Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2006 Ongoing <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Mr, Argudin was the Project Manager. He provided Design and Construction Administrative Services for the <br /> improvements of a synthetic filed and track, as well as, implementing a Drainage and Irrigation system. Estimated <br /> Cost: N/ A. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Doral Middle School - Doral, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />d. 2001 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Mr. Argudin provided Quality Control for this contract. He reviewed and assured that all drawings were designed and <br /> processed meeting all required regulations and codes. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Michael Krop Senior High School, Playfield Restoration _ PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami, Florida 2006 Ongoing <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Mr, Argudin was the Permit Coordinator. His duties included additional services coordination with the County's Park <br /> and Recreation Department in the permit processing stage of the project. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />