My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Architects International
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Architects International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:44:53 PM
Creation date
11/29/2010 3:44:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />KENNETH E. GARDNER <br /> <br />PRINCIPLE <br /> <br />15 <br /> <br />I~, YEARS EXPERIENCE <br /> <br />lb. WITH CURRENT FIRM <br /> <br />13 <br /> <br />a. TOTAL <br /> <br />I S. FIRM NAME AND LOCATION (Ci'y and S'a'.) <br />Rosenberg Gardner Design 5190 N,W. 167 St. Suite III Miami, FL 33014 <br /> <br />16, EDUCATION (DEGREE AND SPEClALlZA TlON) <br />BLA, University of Georgia - 1991 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida - LA - 000 I 569 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publica'ions, Orconiza'ions. Training. Awards, .re,) <br /> <br />Member-American Society of Landscape Architects <br />Member-Builders Association of South Florida <br />Extensive experience in transportation related landscape design for <br />FOOT and several municipalities. <br /> <br />Taught Landscape Design at Miami Dade Community College <br />Proficient in AutoCADD <br /> <br /> (\) TITLE AND LOCATION (Ci'y and S'a'.) (2) YEAR COMPLETED <br /> Oceanfront Park PROFESSIONAL SERVICES CONSTRUCTION (if applicabl.) <br /> Sunny Isles Beach, FL Landscape N/A <br /> Architecture <br /> (3) BRIEF DESCRIPTION (&;.fscap.. si.., cost. .'c,) AND SPECIFIC ROLE <br />a. A 2-1/2 acre beachfront park featuring recreation/restroom pavilion, pathways, <br /> boardwalk and dune restoration. As Prime consultant, RGD prepared the <br /> master plan, construction documents and contract administration for the entire xx Check If project performed with current firm <br /> project and coordinated the work of the engineers and architect. <br /> Cost of Project: $ 1,2 Million Completed: 2000 <br /> (I) TITLE AND LOCATION (Ci" and Sta,.1 12\ YEAR COMPLETED <br /> Grapeland Park PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> N,W. 37 Ave. and N,W. 14 St, Landscape N/A <br /> Miami, FL Architecture <br />b. (3) BRIEF DESCRIPTION (&;.fscap., si.., cost, .'c.) AND SPECIFIC ROL <br /> Prepared planting and irrigation plans and site planning consultations for a 21- <br /> acre park featuring a baseball complex, large aquatic center featuring a lazy xx Check if project performed with current firm <br /> river, water play apparatus and a new banquet hall. <br /> Cost of Project: $27 Million Completion: 2007 <br /> (I) TITLE AND LOCATION (Ci'y and S,a,.) (2) YEAR COMPLETED <br /> Claude Pepper Youth Center PROFESSIONAL SERVICES CONSTRUCTION (if opplicabl.) <br /> 1400 NW I 35 Street Landscape N/A <br /> North Miami, FL Architecture <br /> (3) BRIEF DESCRIPTION (&;.fscop., size, cost, ",c.) AND SPECIFIC ROLE <br />c. <br /> Community Center and Gymnasium, tennis courts, plaza and parking lot at <br /> Claude Pepper Park. RGD prepared the planting and irrigation plans for the xx Check if project performed with current firm <br /> project. <br /> Cost of Project: $ 2.9 Million Completion scheduled for 2008 <br /> (I) TITLE AND LOCATION (0" and S,or.l (2) YEAR COMPLETED <br /> Walker Park Community Center PROFESSIONAL SERVICES CONSTRUCTION (if opplicabl.) <br /> 2825 W, 8'" Avenue Landscape N/A <br /> Hialeah, FL Architecture <br />d. (3) BRIEF DESCRIPTION (&;.fscope. sa., cast, .'c,) AND SPECIFIC ROLE <br /> A new community center and parking lot in Walker Park. RGD prepared <br /> planting and irrigation plans for the project, xx Check if project performed with current firm <br /> Cost of Project: $ 1.7 Million Completion scheduled for 2007. <br />e. (I) TITLE AND LOCATION (City ond S,a,.) (2) YEAR COMPLETED <br />- <br /> <br />19. RELEVANT PROJECTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.