Laserfiche WebLink
<br />12. NAME <br />Jorge Fernandez, II, PLS <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Weidener Surve in & Ma <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Comolete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Project Surveyor <br /> <br />14, YEARS EXPERIENCE <br />a, TOTA25 I b. WITH CURR~N~F1RM <br /> <br />, P.A. <br /> <br />10418 NW 31 Terrace Miami, Florida 33172 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />Considerable continuing education via workshops and enrollment at Florida Professional Surveyor and Mapper # 5103 (1992) <br />the Georgia Institute of Technology and the Southern Technical <br />Institute. <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> N.W. 74th Street Extension from SR-826 to SR-821/HEFT PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami, Florida 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />a, Full design roadway project including horizontal and vertical control, sectional surveys, topographic surveys, DTM, <br /> cross sections, bridge surveys, depiction of plats and delineation of the right of ways and parcel sketches for acquisition. <br /> This 6 mile roadway project encompassed NW 74th Street from SR-836 to the HEFT, NW 58th Street from NW 107 <br /> Avenue to the HEFT, the HEFT from NW 58th Street to NW 74th Street and 7 major side streets. This project was <br /> completed in March 2006 for a fee of $190,085. Mr. Fernandez was the surveyor in responsible charge of the project. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-823 from Dade/Broward County line to S. of Pembroke Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Broward County, Florida 2005 <br />b, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />Full design roadway project encompassing 3,56 miles for the Florida Department of Transportation District Four. The <br /> project entailed HPNC, VPNC, alignment and/or existing right of way lines, aerial targets, topograpy, DTM, cross <br /> sections and sectional surveys (7 sections) to establish the Historic Baseline of Survey, This project was completed in <br /> November 2005 for a fee of$147,365. Mr. Fernandez was the Project Manager in responsible charge of the project. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-874 Northbound On Ramp PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami, Florida 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm <br />c, Design survey services along SR-874 from SW 88th Street, crossing the Snapper Creek Canal to just southwest of SW <br /> 720d Street. WSM effort was to supplement previous control, alignment and photogrammetric mapping provided by <br /> MDX, WSM provided field edit of obscured areas, supplemental topography, bridge surveys, staking and location of <br /> borings, location of trees and delineation of the existing right of way, Project was completed in July 2005 for a fee of <br /> $114,634. Mr. Fernandez was the Project Manager in responsible charge of the project. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami MetroMover, Omni Extention PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami, Florida 2002 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />d, WSM started working on this 1.5 mile elevated transit system throughout downtown Miami in August 1989. Full design <br />surveys including HPNC, VPNC, route surveys, topographic surveys at all proposed stations and utility surveys were <br /> provided. During construction WSM was employed by the construction manager to verify foundations, piers, pier caps, <br /> plinths, running pads and guideways. In 2002, WSM has hired to provide boundary surveys of the entire system. Various <br /> land lines were tied via survey of the City of Miami monument lines in the vicinity which were part of the original <br /> control for the project. Total fee for the design and construction management was $515,200 and the boundary surveys <br /> were $130,171. Mr. Fernandez was the surveyor in responsible charge of the project throughout all its phases. <br /> <br />19 RELEVANT PROJECTS <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />