My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Architects International
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Architects International
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 3:44:53 PM
Creation date
11/29/2010 3:44:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 p~ojects, if not specified, <br />Comolete one Section F for each oroiect.) <br />21. TITLE AND LOCATION (City and State) <br />Dadeland North Parking Garage and Bus Station <br />Miami, Florida <br /> <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />4 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />1992 <br /> <br />1994 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT <br />MOTA/FOOT Mr, Aurelio Rodriguez, P,E, <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 375-2961 <br /> <br />This 11-story, concrete parking garage is located on US1, on a site restricted by the Snapper Creek Canal to <br />the South and its 2-fl proximity to Metrorail's Dadeland North Station elevated guide-way, With total capacity <br />for 2000 vehicles, it was designed with the promenade level adjacent to the canal and provisions for future use <br />as commercial/ retail space with allowance for a future child-care facility on the ground level. Design features <br />include speed helix for direct exit from the 5 upper levels and sophisticated parking control equipment. There is <br />camera surveillance throughout the building and patron safety is monitored from a strategically located security <br />control office, All parking space counts, audits and Diagnostics are done by equipment in a Control Center. It <br />also functions as a Bus Station on Ground Floor with 10 Bus Stops. The Design Phase was conducted by <br />MOTA and the Construction was handled by FOOT. <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a, Architects International, Inc. Miami, FL Prime <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f, <br /> <br />STANDARD FORM 330 (6/2004) PAGE 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.