Laserfiche WebLink
<br />12. NAME <br />Marvin Scharf, AlA, NCARB <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke <br />13. ROLE IN THIS CONTACT <br />Architect <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />42 August 2006 <br /> <br />15. NAME OF FIRM AND LOCATION (City and State) <br />IBI Group, Inc., Pompano Beach, Florida <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND <br />DISCIPLINE) <br />Architecture, A.A.S., Building Construction Florida, Connecticut, California - Architecture <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />A.I.A., NCARB <br /> <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />Broward Central Regional Park, Fort Lauderdale, Florida SERVICES (if applicable) <br />Architect 2007 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (x) Check if project performed with current firm <br />Architect for Design/Build Team, designing and constructing a 11 O-acre Regional Park to serve the Central Broward <br />County Community. Park will contain ball fields, picnic pavilions, lakes, pathways, aquatics center and multi-purpose <br />field and club house. Park is presently under construction and scheduled for completion in late 2007. <br /> <br />Role: Architect Construction Cost $47 million (entire project) <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Parking Structure, Seminole Hard Rock Hotel & Casino, Hollywood, PROFESSIONAL CONSTRUCTION <br />Florida SERVICES (if applicable) <br />Architect 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (x) Check if project performed with current firm <br />IBI Group, Inc., formerly known as Schart and Associates, Inc., designed a 2,000 vehicle parking structure at the Hard <br />Rock Hotel & Casino. Details: 7 story, 830,000 sq. ft. building with a steel structural framework, site cast concrete <br />spandrel panels and is served by 6 elevators. <br /> <br /> <br /> <br />Role: Architect Construction Cost $30 million <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />Young Circle Artspark, Hollywood, Florida SERVICES (if applicable) <br />Architect 2007 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (x) Check if project performed with current firm <br />Redesign of historic park by creating a 'bold & visionary' concept of redevelopment, while respecting the historical <br />context of the existing walkway system and existing tree canopy. Elements of the park included active and passive <br />water features, sculpture garden, natural children's playground, new amphitheater serving over 2,000 spectators, dance <br />and art studios and a 'black box theater'. <br />Role: Architect Construction Cost $8.6 million (Phase 1) $5.3 million (Phase 2) <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />Aquatic Center, Tamarac, Florida SERVICES (il applicable) <br />Architect 2007 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ere.) AND SPECIFIC ROLE (x) Check il project performed with current firm <br />As a member of a Design/Build team, IBI Group, Inc., formerly known as Scharf & Associates, Inc., completed the <br />design of an Aquatic Building and Fitness Center for the City of Tamarac. The architectural design of the building <br />reflects the surrounding community. The Facility houses administrative facilities toilets/locker/shower facilities and all <br />equipment servicing the swimming pool. <br /> <br />~ <br />tl...a:.:....'~~ <br /> <br />""" ~~.. .......~- <br />i .~.. _ .... <br /> <br />Role: Architect <br /> <br />Construction Cost $200,000 <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />