Laserfiche WebLink
<br />~ <br /> <br />~ <br /> <br />12. NAME <br />Richard E. Durr, Jr., A.S.L.A., A.I.C.P. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTACT <br />Project Manager, Landscape <br />Architect <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />13 1 <br /> <br />~ <br /> <br />15. NAME OF FIRM AND LOCATION (City and State) <br />IBI Group, Inc., 12008 South Shore Blvd., Suite 207, Wellington, Florida 33414 <br />. 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />II' B.S. Landscape Architecture, University of Florida, 1993 DISCIPLINE) <br />Florida Landscape Architect #LAOOO 1577 <br />I American Planning Association AICP #016642 <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Florida Recreation & Parks Association: Commissioner, Planning & Zoning, Village of Royal Palm Beach, Harvard University <br />Short Course: Project Management for Design Professionals (1999); 2002 FASLA award of honor Indian Riverside Park; <br />2002 FASLA award of merit Nob Hill Soccer <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Catherine Strong Park <br />Delray Beach, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (if applicable) <br />2004 2005 <br /> <br />a. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br />Construction Documents: Cost $16,000; Project Description: The 4-acre project entails the complete demolition of the <br />existing park site; create a new park site plan including a splash park, basketball courts, tennis courts, restroom <br />building, parking, lighting, landscape, passive greenspace, etc. <br /> <br />b. <br /> <br />Construction <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (if applicable) <br />2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (x) Check if project performed with current firm <br />Construction Documents; Total Cost $40,000; Project Description: Design and construction documents for the 2.5 acre <br />site adjacent to Atlantic High School. Includes site plan, landscape design, hardscape design. <br /> <br />Role: Principal in Charge <br />(1) TITLE AND LOCATION (City and State) <br />Eagle Park <br />Delray Beach, Florida <br /> <br />Role: Project Manager <br />(1) TITLE AND LOCATION (City and State) <br />North Miami Parks System Master Plan <br />North Miami, Florida <br /> <br />c. <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (if applicable) <br />2006 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (x) Check if project performed with current firm <br />Construction Documents; Total Cost $140,000; Project Description: Includes revision of the approved master plan <br />based on changed site conditions. Construction documents are under development to include a restroom facility, <br />passive recreation facilities, a new parking area, enhanced retention areas, landscape design and paths. <br /> <br />~ <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (if applicable) <br />2007 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br />In working on an overall Atlantic Greenway Network for Miami Beach, special attention was given to the area along <br />Miami Beach's Collins Canal for a bike path along the length of the waterway. <br /> <br /> <br /> <br />,~ii <br /> <br /> <br /> <br />. <br /> <br />Role: Project Manager <br />(1) TITLE AND LOCATION (City and State) <br />Dade Boulevard Bike Path, a part of the Atlantic Greenway Network <br />City of Miami Beach, Florida <br /> <br />~ d. <br /> <br />~ <br /> <br />.. .. 'i <br /> <br />~ <br /> <br /> <br />~ <br /> <br />Role: Principal in Charge <br /> <br />Construction Cost <br /> <br />I <br /> <br />STANDARD FORM 330 (6/2004) PAGE <br />