My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
IBI Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 4:01:34 PM
Creation date
11/29/2010 4:01:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Broward County Greenways PROFESSIONAL CONSTRUCTION <br /> Broward County, Florida SERVICES (if applicable) <br /> 2006 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Planning and Design of Greenway Corridors; Cost $100,000 (to date 8-07); Project Description: Project involves the <br /> implementation of the Greenways priority corridor master plans. Providing project management, master planning and <br /> detailed design services for the final design and construction of some 25 miles of Greenway corridors. <br /> Role: Project Manager Construction Cost <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Shore Blvd. Landscape PROFESSIONAL CONSTRUCTION <br /> Wellington, Florida SERVICES (if applicable) <br /> 2004 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Construction Documents; Total Cost $45,000; Project Description: Included landscape design, equestrian trail design, <br /> neighborhood entrance designs, gateway designs, hardscape design for 2 miles of roadway enhancements. <br /> Role: Project Manager Construction Cost <br /> <br />~ <br /> <br />~ <br /> <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.