My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI Group
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
IBI Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 4:01:34 PM
Creation date
11/29/2010 4:01:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br />Patrea St. John, RLA, LEED AP <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Com lete one Section E for each ke <br />13. ROLE IN THIS CONTACT <br />Planning and Landscape <br />Architecture <br />15. NAME OF FIRM AND LOCATION (City and State) <br />IBI Group, Inc., Pompano Beach, Florida <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br /> <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />25 2.5 <br /> <br />BLA Landscape Architecture <br />LEED Accredited professional <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society for Landscape Architects, Funding Arts Broward, Founding and Board Member <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Florida Registered Landscape Architect, # 1117 <br /> <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Conceptual Wayfinding System PROFESSIONAL CONSTRUCTION <br />Pompano Beach, Florida SERVICES (if applicable) <br />2007 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (x) Check if project performed with current firm <br />City of Pompano Beach received a Design Arts Program Grant from the Broward County Cultural Council and hired IBI <br />Group, Inc. to design a conceptual wayfinding system that would preserve and enhance the Historic Downtown <br />Pompano Beach area. <br /> <br />Role: Senior Planner <br /> <br />Construction Cost: <br /> <br /> <br />Ce. <br />0. ,., <br />~I'~~ <br />::. ..0 ---1 n <br /> <br />..... . "...1Il <br /> <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Island Garden at Long Key Natural Area <br />Town of Davie, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (if applicable) <br />2007 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (x) Check if project performed with current firm <br />Served as a Project Manager providing planning services for strategy, design, project management, coordination with <br />Design Studio. Additional services included construction cost estimate, permitting and meeting attendance with <br />regulatory agencies. <br /> <br />b. <br /> <br />Role: Project Manager <br />(1) TITLE AND LOCATION (City and State) <br />Overtown Pedestrian Mall <br />Dade County, Florida <br /> <br />c. <br /> <br />Construction Cost: <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (if applicable) <br />1996 1996 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE () Check if project performed with current firm <br />Served as a Project Manager. Project was an award-winning design and implementation of a streetscape and <br />pedestrian mall located in the historic Overtown neighborhood that involved coordinating many disciplines and <br />regulatory agencies. Fast track project progressed from design to completion in 6 months to secure bond funding. <br /> <br />Role: Project Manager while with WRT <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Construction Cost: $2.75 million <br />(2) YEAR COMPLETED <br />PROFESSIONAL CONSTRUCTION <br />SERVICES (if applicable) <br />Phase I 1999 <br />Phase II 2004 <br />Continuing <br />Services thru <br />2007 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (x) Check if project performed with current firm <br /> <br />STANDARD FORM 330 (6/2004) PAGE 1 <br /> <br />Griffin Road - Expansionllmprovements <br />Broward County, Florida <br /> <br />d. <br /> <br />~ <br /> <br />L <br />
The URL can be used to link to this page
Your browser does not support the video tag.