|
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />12. NAME
<br />Uday A. Kirtikar, P.E.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTACT
<br />Principal-in-Charge
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL I b. WITH CURRENT FIRM
<br />37 30
<br />
<br />~
<br />
<br />15. NAME OF FIRM AND LOCATION (City and State)
<br />Walker Parking Consultants/Engineers, Inc., Tampa, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
<br />DISCIPLINE)
<br />Master of Science in Engineering Registered Professional Engineer in Florida
<br />
<br />Registration No. PE-45006
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Florida Engineering Society, Florida Parking Association, National Society of Profession Engineers, Urban land Institute
<br />
<br />~
<br />
<br />~
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />~
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida Gulf Coast University parking Structure PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Fort Myers, Florida 2005 2006
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker was the Prime Designer on this 671 space parking structure project. The structure consists of three supported
<br /> levels of precast, pretopped concrete tees and a slab-on-grade. Construction cost: $6,425,000. Uday Kirtikar was
<br /> Principal-in-Charge and responsible for functional design and quality assurance.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Merrick Place - Shops and Parking PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Coral Gables, Florida 1995 1997
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker was the Prime Designer on this 435 space parking structure, which also included 14,000 square feet of retail
<br /> space. The all precast concrete structural system includes double tees, shear wall, spandrel, columns and beams that
<br /> create a distinctive design. Construction cost: $8,500,000. Uday Kirtikar was the Project Manager and responsible for
<br /> functional and structural design.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Naples Jail Center Parking Structure PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Naples, Florida 2002 2004
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker provided structural engineering services for this six level structure with 445 spaces, utilizing a precast concrete
<br /> structural system. The garage is designed for future expansion of two levels. Construction cost: $9,700,000. Uday
<br /> Kirtikar was Principal-in-Charge and responsible for quality assurance.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Pierce Street Parking Garage PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Tampa, Florida 2001 2003
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker prepared the design criteria drawings and specifications for this 578 space parking structure, which was built
<br /> using a design-build delivery system. A precast concrete double-tee system with bearing walls on the perimeter was
<br /> used as the structural system for the ten level structure. Construction cost: $8,600,000. Uday Kirtikar was Principal-in-
<br /> Charge and responsible for quality assurance.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Vanderbilt Beach Parking Structure PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Naples, Florida 2004 2006
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker was the Prime Designer on this three level, 340 space precast concrete parking structure located in an
<br /> environmentally sensitive area. Construction cost: $7,596,000. Uday Kirtikar was Principal-in-Charge and responsible
<br /> for quality assurance.
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 1
<br />
<br />~
<br />
|