Laserfiche WebLink
<br />~ <br /> <br />~ <br /> <br />~ <br /> <br />12. NAME <br />Uday A. Kirtikar, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTACT <br />Principal-in-Charge <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT FIRM <br />37 30 <br /> <br />~ <br /> <br />15. NAME OF FIRM AND LOCATION (City and State) <br />Walker Parking Consultants/Engineers, Inc., Tampa, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Master of Science in Engineering Registered Professional Engineer in Florida <br /> <br />Registration No. PE-45006 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Florida Engineering Society, Florida Parking Association, National Society of Profession Engineers, Urban land Institute <br /> <br />~ <br /> <br />~ <br /> <br />19. RELEVANT PROJECTS <br /> <br />~ <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida Gulf Coast University parking Structure PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Fort Myers, Florida 2005 2006 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker was the Prime Designer on this 671 space parking structure project. The structure consists of three supported <br /> levels of precast, pretopped concrete tees and a slab-on-grade. Construction cost: $6,425,000. Uday Kirtikar was <br /> Principal-in-Charge and responsible for functional design and quality assurance. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Merrick Place - Shops and Parking PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Coral Gables, Florida 1995 1997 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker was the Prime Designer on this 435 space parking structure, which also included 14,000 square feet of retail <br /> space. The all precast concrete structural system includes double tees, shear wall, spandrel, columns and beams that <br /> create a distinctive design. Construction cost: $8,500,000. Uday Kirtikar was the Project Manager and responsible for <br /> functional and structural design. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Naples Jail Center Parking Structure PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Naples, Florida 2002 2004 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker provided structural engineering services for this six level structure with 445 spaces, utilizing a precast concrete <br /> structural system. The garage is designed for future expansion of two levels. Construction cost: $9,700,000. Uday <br /> Kirtikar was Principal-in-Charge and responsible for quality assurance. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pierce Street Parking Garage PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Tampa, Florida 2001 2003 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker prepared the design criteria drawings and specifications for this 578 space parking structure, which was built <br /> using a design-build delivery system. A precast concrete double-tee system with bearing walls on the perimeter was <br /> used as the structural system for the ten level structure. Construction cost: $8,600,000. Uday Kirtikar was Principal-in- <br /> Charge and responsible for quality assurance. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Vanderbilt Beach Parking Structure PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Naples, Florida 2004 2006 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker was the Prime Designer on this three level, 340 space precast concrete parking structure located in an <br /> environmentally sensitive area. Construction cost: $7,596,000. Uday Kirtikar was Principal-in-Charge and responsible <br /> for quality assurance. <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />STANDARD FORM 330 (6/2004) PAGE 1 <br /> <br />~ <br />