Laserfiche WebLink
<br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />12. NAME <br />Elliot B. Hathorn, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E for each kev oerson.) <br />13. ROLE IN THIS CONTACT <br />Project Manager <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL -T b. WITH CURRENT FIRM <br />21 I 13 <br /> <br />~ <br /> <br />15. NAME OF FIRM AND LOCATION (City and State) <br />Walker Parking Consultants/Engineers, Inc., Tampa, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Bachelor of Science in Civil Engineering Registered Professional Engineer in Florida <br /> <br />Registration No. 34691 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Civil Engineers <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida Community College Deerwood Center Parking Garage PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Jacksonville, Florida 2005 2006 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker was the Prime Designer on this four level, 367 space precast concrete parking structure. Construction cost: <br /> $8,700,000. Elliot Hathorn was the Project Manager. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> H. Lee Moffitt Cancer Center Parking Structure PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Tampa, Florida 1999 2001 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker provided the functional and structural design for this five level, 588 space cast-in-place, post-tensioned parking <br /> structure, to include design for two future vertical levels. Construction cost: $14,288,000. Elliot Hathorn was the <br /> Project Manager. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> North Broward Medical Center Parking Garage PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Deerfield Beach, Florida 2006 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ./ ) Check if project performed with current firm <br /> Walker to provide architectural. functional, structural and MEP design services for a four level, 551 space parking <br /> structure. Construction cost estimate: $9,676,000. Elliot Hathorn is the Project Manager. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> University of South Florida Parking Garage III PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Tampa, Florida 2004 2006 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker provided functional, structural and MEP design services on six level, 1,515 space parking structure. <br /> Construction cost: $11,211,000. Elliot Hathorn was the Project Manager. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Vanderbilt Beach Parking Structure PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Naples, Florida 2004 2006 <br />e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker was the Prime Designer on this three level, 340 space precast concrete parking structure located in an <br /> environmentally sensitive area. Construction cost: $7,596,000. Elliot Hathorn was the Project Manager. <br /> <br />19 RELEVANT PROJECTS <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />- <br />