|
<br />,-
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />12. NAME
<br />Kenneth J. Terry, P.E.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTACT
<br />Electrical/Mechanical Engineer
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL I b. WITH CURRENT FIRM
<br />30 20
<br />
<br />~
<br />
<br />~
<br />
<br />15. NAME OF FIRM AND LOCATION (City and State)
<br />Walker Parking Consultants/Engineers, Inc., Kalamazoo, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
<br />DISCIPLINE)
<br />Bachelor of Science in Electrical Engineering and Registered Professional Engineer in Florida
<br />Technology
<br />Registration No. PE-49813
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Institute of electrical and Electronic Engineers, Industrial Application Society
<br />
<br />~
<br />
<br />~
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />~
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida Gulf Coast University PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Fort Myers, Florida 2005 2006
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker was the Prime Designer on this 671 space parking structure project. The structure consists of three supported
<br /> levels of precast, pretopped concrete tees and a slab-on-grade. Construction cost: $6,425,000. Ken Terry was
<br /> responsible for the mechanical, electrical and plumbing design.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Orlando Sanford International Airport PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Sanford, Florida 2005 2006
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker was the Prime Designer on this five level, 830 space parking structure, Construction cost: $10,033,000. Ken
<br /> Terry was responsible for the mechanical, electrical and plumbing design.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Naples Jail Center Parking Structure PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Naples, Florida 2002 2004
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker provided structural engineering services for this six level structure with 445 spaces, utilizing a precast concrete
<br /> structural system. The garage is designed for future expansion of two levels. Construction cost: $9,700,000. Ken
<br /> Terry was responsible for the mechanical, electrical and plumbing design.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Collier County Development Services Parking Structure PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Naples, Florida 2001 2003
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker provided functional, structural and MEP design services for this three level, 280 space sparking structure. Ken
<br /> Terry was responsible for the mechanical, electrical and plumbing design.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Vanderbilt Beach Parking Structure PROFESSIONAL CONSTRUCTION
<br /> SERVICES (if applicable)
<br /> Naples, Florida 2004 2006
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm
<br /> Walker was the Prime Designer on this three level, 340 space precast concrete parking structure located in an
<br /> environmentally sensitive area. Construction cost: $7,596,000. Ken Terry was responsible for the mechanical,
<br /> electrical and plumbing design.
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />~
<br />
<br />-
<br />
<br />-
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 3
<br />
<br />~
<br />
|