Laserfiche WebLink
<br />,- <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />12. NAME <br />Kenneth J. Terry, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTACT <br />Electrical/Mechanical Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT FIRM <br />30 20 <br /> <br />~ <br /> <br />~ <br /> <br />15. NAME OF FIRM AND LOCATION (City and State) <br />Walker Parking Consultants/Engineers, Inc., Kalamazoo, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Bachelor of Science in Electrical Engineering and Registered Professional Engineer in Florida <br />Technology <br />Registration No. PE-49813 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Institute of electrical and Electronic Engineers, Industrial Application Society <br /> <br />~ <br /> <br />~ <br /> <br />19. RELEVANT PROJECTS <br /> <br />~ <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida Gulf Coast University PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Fort Myers, Florida 2005 2006 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker was the Prime Designer on this 671 space parking structure project. The structure consists of three supported <br /> levels of precast, pretopped concrete tees and a slab-on-grade. Construction cost: $6,425,000. Ken Terry was <br /> responsible for the mechanical, electrical and plumbing design. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Orlando Sanford International Airport PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Sanford, Florida 2005 2006 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker was the Prime Designer on this five level, 830 space parking structure, Construction cost: $10,033,000. Ken <br /> Terry was responsible for the mechanical, electrical and plumbing design. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Naples Jail Center Parking Structure PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Naples, Florida 2002 2004 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker provided structural engineering services for this six level structure with 445 spaces, utilizing a precast concrete <br /> structural system. The garage is designed for future expansion of two levels. Construction cost: $9,700,000. Ken <br /> Terry was responsible for the mechanical, electrical and plumbing design. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Collier County Development Services Parking Structure PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Naples, Florida 2001 2003 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker provided functional, structural and MEP design services for this three level, 280 space sparking structure. Ken <br /> Terry was responsible for the mechanical, electrical and plumbing design. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Vanderbilt Beach Parking Structure PROFESSIONAL CONSTRUCTION <br /> SERVICES (if applicable) <br /> Naples, Florida 2004 2006 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( ) Check if project performed with current firm <br /> Walker was the Prime Designer on this three level, 340 space precast concrete parking structure located in an <br /> environmentally sensitive area. Construction cost: $7,596,000. Ken Terry was responsible for the mechanical, <br /> electrical and plumbing design. <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />- <br /> <br />- <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br /> <br />~ <br />