Laserfiche WebLink
<br />12, NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person,) <br />13, ROLE IN THIS CONTRACT <br /> <br />George Sokola, BS, Civil Engineering <br />15, FIRM NAME AND LOCATION (City and State) <br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16, EDUCATION !DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Construction Manager <br /> <br />14, YEARS EXPERIENCE <br />a, TOTAL 321b. WITH CURRENT FIRM 25 <br /> <br />BS /1969 / Civil Engineering, Massachusetts Institute of Technology <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc,) <br /> <br />ASBI Grouting Certiification <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> V A (Veterans Administration Hospital) - New Offices and Warehouse Building PROFESSIONAL SERVICESjlCONSTRUCTION (If applicable) <br /> West Palm Beach, FL 2005 2006 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Construction Manager for this Design-Build Hybrid project. One-story office/warehouse building with 10,000 sf + parking lot, loading areas and <br /> landscaping. Total Cost $UM, <br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> Norona Limited, LLC Office Building PROFESSIONAL SERVICES~ICONSTRUCTION (If applicable) <br /> Sunrise, FL 2004 2005 <br /> 13) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />b, Construction Manager - For this Design-Build project. Five-story Office Building, 75,000 sf of construction + 300 parking spaces parking lot and <br /> landscaping. Cost $8M, <br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> Central Island Drainage and Street Improvements PROFESSIONAL SERVICES IICONSTRUCTION (If applicable) <br /> City of Sunny Isles Beach 2008 Present <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />c. Project Manager / Senior Field Inspector for the roadway rehabilitation and drainage system <br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> 1-75/1-595 Interchange PROFESSIONAL SERVICES i ICONSTRUCTION (If applicable) <br /> FOOT District 4 2005 2008 <br />d. 13) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Field Engineer for the segmental bridges rehabilitayion. Comprehensive Inspection and detailed records were required for this project. <br /> Cost $,248,983 <br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> Port of Miami Bridge PROFESSIONAL SERVICES ZICONSTRUCTION (If applicable) <br /> Port of Miami 1992 1996 <br /> 13) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE l.XJ Check if project performed with current firm <br />e. Senior Bridge Inspector for the construction of this segmental bridge, Casting yard and construction site CEI services, The overall bridge length is <br /> 2,522 feet with 65 feet vertical clearance, Total Construction Cost: $ 39 M <br /> <br />STANDARD FORM 330 162004) PAGE 2 <br />Continuation Sheet <br />