|
<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person,)
<br />13, ROLE IN THIS CONTRACT
<br />
<br />George Sokola, BS, Civil Engineering
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326
<br />16, EDUCATION !DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />Construction Manager
<br />
<br />14, YEARS EXPERIENCE
<br />a, TOTAL 321b. WITH CURRENT FIRM 25
<br />
<br />BS /1969 / Civil Engineering, Massachusetts Institute of Technology
<br />
<br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc,)
<br />
<br />ASBI Grouting Certiification
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> V A (Veterans Administration Hospital) - New Offices and Warehouse Building PROFESSIONAL SERVICESjlCONSTRUCTION (If applicable)
<br /> West Palm Beach, FL 2005 2006
<br />a. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Construction Manager for this Design-Build Hybrid project. One-story office/warehouse building with 10,000 sf + parking lot, loading areas and
<br /> landscaping. Total Cost $UM,
<br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> Norona Limited, LLC Office Building PROFESSIONAL SERVICES~ICONSTRUCTION (If applicable)
<br /> Sunrise, FL 2004 2005
<br /> 13) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />b, Construction Manager - For this Design-Build project. Five-story Office Building, 75,000 sf of construction + 300 parking spaces parking lot and
<br /> landscaping. Cost $8M,
<br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> Central Island Drainage and Street Improvements PROFESSIONAL SERVICES IICONSTRUCTION (If applicable)
<br /> City of Sunny Isles Beach 2008 Present
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />c. Project Manager / Senior Field Inspector for the roadway rehabilitation and drainage system
<br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> 1-75/1-595 Interchange PROFESSIONAL SERVICES i ICONSTRUCTION (If applicable)
<br /> FOOT District 4 2005 2008
<br />d. 13) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Field Engineer for the segmental bridges rehabilitayion. Comprehensive Inspection and detailed records were required for this project.
<br /> Cost $,248,983
<br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> Port of Miami Bridge PROFESSIONAL SERVICES ZICONSTRUCTION (If applicable)
<br /> Port of Miami 1992 1996
<br /> 13) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE l.XJ Check if project performed with current firm
<br />e. Senior Bridge Inspector for the construction of this segmental bridge, Casting yard and construction site CEI services, The overall bridge length is
<br /> 2,522 feet with 65 feet vertical clearance, Total Construction Cost: $ 39 M
<br />
<br />STANDARD FORM 330 162004) PAGE 2
<br />Continuation Sheet
<br />
|