|
<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Patrick Hayes, B.S.C.E.
<br />15, FIRM NAME AND LOCATION (Citv flnd State)
<br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326
<br />16, EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />Senior Field Engineer
<br />
<br />14, YEARS EXPERIENCE
<br />
<br />a. TOTAL 321b, WITH CURRENT FIRM 25
<br />
<br />B,S,C,E,/1984/ Cornell University, Ithaca, New York
<br />
<br />lB, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc,)
<br />A TSSA Worksite Safety Supervisor
<br />FOOT Final Estimates, ACI
<br />
<br />19, RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (CitV and State) 12) YEAR COMPLETED
<br /> Central Island Drainage and Street Improvements PROFESSIONAL SERVICESll~ONSTRUCTION (If applicable)
<br /> City of Sunny Isles Beach 2008 Under Construction
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />a. Project Manager / Senior Field Inspector for the roadway rehabilitation and drainage system
<br /> (1) TITLE AND LOCATION (Citv and State) 12) YEAR COMPLETED
<br /> SR 826 at NW 74th Street, South River Drive and Okeechobee Road PROFESSIONAL SERVICESljCONSTRUCTION (If applicable)
<br /> FOOT 6 2003 2007
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />b. Senior Field Inspector. Construction Cost $ 71 million
<br /> (1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED
<br /> SR 826 at NW 103rd Street, Reconstruction PROFESSIONAL SERVICES) ICONSTRUCTION (If applicable)
<br /> FOOT 6 1999 2003
<br />c, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Project Administrator for this reconstruction project. His duties included the supervision of a very complex MOT scheme whereby the original
<br /> speed limit has been maintained with no daytime lane closures allowed. Cost $ 39 millions
<br /> 11) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED
<br /> 1-195 / SR 112 Bridge Widening from NE 1 st A venue to Biscayne Blvd, PROFESSIONAL SERVICES, ICONSTRUCTION (If applicable)
<br /> FOOT 6 1997 1999
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d. Senior Inspector/Assistant Project Engineer for this reconstruction project
<br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED
<br /> SR 395/MacArthur Causeway Reconstruction Project PROFESSIONAL SERVICES 11CONSTRUCTION (If applicable)
<br /> FOOT 6 1992 1993
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l2SJ Check if project performed with current firm
<br />e. Bridge Construction Engineer/Field Inspector for this project and consisted of the construction of two 2500 ft, long parallel bridges with two-cell
<br /> segmental superstructures. The project required complex traffic control ensuring all passengers and goods are able to enter the Port through this
<br /> single entrance, Cost: $ 17 millions
<br />
<br />STANDARD FORM 330 162004) PAGE 2
<br />Continuation Sheet
<br />
|