Laserfiche WebLink
<br />12, NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Patrick Hayes, B.S.C.E. <br />15, FIRM NAME AND LOCATION (Citv flnd State) <br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16, EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Senior Field Engineer <br /> <br />14, YEARS EXPERIENCE <br /> <br />a. TOTAL 321b, WITH CURRENT FIRM 25 <br /> <br />B,S,C,E,/1984/ Cornell University, Ithaca, New York <br /> <br />lB, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc,) <br />A TSSA Worksite Safety Supervisor <br />FOOT Final Estimates, ACI <br /> <br />19, RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (CitV and State) 12) YEAR COMPLETED <br /> Central Island Drainage and Street Improvements PROFESSIONAL SERVICESll~ONSTRUCTION (If applicable) <br /> City of Sunny Isles Beach 2008 Under Construction <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />a. Project Manager / Senior Field Inspector for the roadway rehabilitation and drainage system <br /> (1) TITLE AND LOCATION (Citv and State) 12) YEAR COMPLETED <br /> SR 826 at NW 74th Street, South River Drive and Okeechobee Road PROFESSIONAL SERVICESljCONSTRUCTION (If applicable) <br /> FOOT 6 2003 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />b. Senior Field Inspector. Construction Cost $ 71 million <br /> (1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED <br /> SR 826 at NW 103rd Street, Reconstruction PROFESSIONAL SERVICES) ICONSTRUCTION (If applicable) <br /> FOOT 6 1999 2003 <br />c, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Project Administrator for this reconstruction project. His duties included the supervision of a very complex MOT scheme whereby the original <br /> speed limit has been maintained with no daytime lane closures allowed. Cost $ 39 millions <br /> 11) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED <br /> 1-195 / SR 112 Bridge Widening from NE 1 st A venue to Biscayne Blvd, PROFESSIONAL SERVICES, ICONSTRUCTION (If applicable) <br /> FOOT 6 1997 1999 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. Senior Inspector/Assistant Project Engineer for this reconstruction project <br /> 11) TITLE AND LOCATION (City and State) 12) YEAR COMPLETED <br /> SR 395/MacArthur Causeway Reconstruction Project PROFESSIONAL SERVICES 11CONSTRUCTION (If applicable) <br /> FOOT 6 1992 1993 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l2SJ Check if project performed with current firm <br />e. Bridge Construction Engineer/Field Inspector for this project and consisted of the construction of two 2500 ft, long parallel bridges with two-cell <br /> segmental superstructures. The project required complex traffic control ensuring all passengers and goods are able to enter the Port through this <br /> single entrance, Cost: $ 17 millions <br /> <br />STANDARD FORM 330 162004) PAGE 2 <br />Continuation Sheet <br />