Laserfiche WebLink
<br />12,NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13, ROLE IN THIS CONTRACT <br /> <br />Delio Perez, BS, Structural Engineering <br />15, FIRM NAME AND LOCATION (CitvandStRte) <br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16, EDUCATION (DEGREE AND SPECIALlZA TlDN) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Senior Structural Engineer <br /> <br />14, YEARS EXPERIENCE <br />a, TOTAL 50lb, WITH CURRENT FIRM 23 <br /> <br />B.S,C,E, /1954 / Civil Engineering, University of Ohio, Ohio 1954 <br /> <br />Professional Engineer Florida 10800 1969 <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. TrRining, Awards. etc,) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED <br /> Newport Fishing Pier PROFESSIONAL SERVICES IICONSTRUCTION (If applicRble) <br /> City of Sunny Isles Beach 2010 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Member of the Design Team for the Newport Fishing Pier replacement in the City of Sunny Isles, The new replacement pier incorporate methos to <br /> reduce damage from storms and increase reliablity and performance of the structure, The structure, restaurant and railing meet ADA requirements <br /> and some amenities for fishing activities, The total cost of the project is $4.5 M <br /> (1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED <br /> NW 21st Avenue Pedestrian Bridge over C-13 Canal PROFESSIONAL SERVICES ~ ICONSTRUCTION (If applicable) <br /> Broward County 2008 2009 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />Member for the Design Team for the NW, 21st Avenue Pedestrian Bridge Over C-13 Canal in Broward County. The structure is a tubula truss with <br /> concrete deck and concrete approach ramps meeting ADA requirements, This structure gives full accsess to school/pedestrian access, <br /> (1) TITLE AND LOCATION (Citv and State) (2) YEAR COMPLETED <br /> Pedestrian Bridge over Dressel's Dairy Canal PROFESSIONAL SERVICES ~ ICONSTRUCTION (If applicable) <br /> Miami Dade County 2003 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Member of the Design Team for this pedestrian bridge over Dressel's Dairy Canal in Miami Dade County, Project Cost $ 340,000 <br /> (1) TITLE AND LOCATION (Citv and State) 12) YEAR COMPLETED <br /> Broward County Central Library PROFESSIONAL SERVICES ,I CONSTRUCTION (If applicable) <br /> 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE l2SJ Check if project performed with current firm <br />d. Member of design team for escalator/stair replacement and redesign, Cost $ O,7M, <br /> (1) TITLE AND LOCATION (CitV and State) 12) YEAR COMPLETED <br /> Norona Limited, LLC Office Building PROFESSIONAL SERVICES II CONSTRUCTION (If applicable) <br /> Sunrise, FL 2004 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc,) AND SPECIFIC ROLE LXJ Check if project performed with current firm <br />e. QC + QA for Structural Design - For this Design-Build project. Five-story Office Building, 75,000 sf of construction + 300 parking spaces parking <br /> lot and landscaping, Cost $8M, <br /> <br />STANDARD FORM 330 (62004) PAGE 2 <br />Continuation Sheet <br />