|
<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person,)
<br />13, ROLE IN THIS CONTRACT
<br />
<br />ManueIR.Sanche~P.E.
<br />Director of Structural Design
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326
<br />16, EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />Structural Designer
<br />
<br />14, YEARS EXPERIENCE
<br />a, TOTAL Ib, WITH CURRENT FIRM
<br />371 37
<br />
<br />B,S,C,E.!1973! New College of Engineering Professional Engineer Florida 27510 (1980)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, A wards, etc,)
<br />
<br />American Society of Civil Engineers
<br />Institute
<br />
<br />American Segmental Bridge Institute
<br />
<br />American Concrete Institute
<br />
<br />Precast/Prestressed Concrete
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Newport Fishing Pier PROFESSIONAL SERVICES ~ICONSTRUCTION (If applicable)
<br /> City of Sunny Isles Beach, FL 2010 Under Final Review by City
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Engineer of Record and Chief Structural Designer of the 602 foot long Newport Fishing Pier located in Sunny Isles Boulevard and Collins Aveue,
<br /> The Structural Plans are completed and under review, Engineer Cost Estimate $4,5 M,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> The North Bay Road Pedestrian & Emergency Vehicle Bridge, Extension of North Bay Road PROFESSIONAL SERVICES II~ONSTRUCTION (If applicable)
<br /> from 172nd to 174th Street, City of Sunny Isles Beach, FL 2010 Under final review by City
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />b. Engineer of Record and Chief Structural Designer. The bridge is under the final design phase and is composed of five (5) simple supported spans
<br /> with new Florida 1-36 beams with exterior haunch beams. Engineer Cost Estimate $1,9 M,
<br /> (1) TITLE AN D LOCA TI ON (City and State) (2) YEAR COMPLETED
<br /> Gwen Margolis Park PROFESSIONAL SERVICES IICONSTRUCTION (If applicable)
<br /> City of Sunny Isles Beach 2009 2009
<br />C. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Engineer of Record and Chief Structural Designer of the foundation mounted on Augercast Piles for the Prefabricated BR Building. Cost $75,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NW 21 st Avenue Pedestrian Bridge over C-13 Canal PROFESSIONAL SERVICES ,CONSTRUCTION (If applicable)
<br /> Broward County, FL 2008-2009 Under Construction
<br />d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Engineer of Record and Chief Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA
<br /> requirements. This structure gives full accsess to school! pedestrian access,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Pedestrian Bridge over Dressel's Dairy Canal PROFESSIONAL SERVICES llCONSTRUCTION (If applicable)
<br /> Miami-Dade County, FL 2003 2004
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l.Kr Check if project performed with current firm
<br />e. Engineer of Record and chief Structural Designer of this tubular truss pedestrian bridge with concrete deck and approach ramps meeting ADA
<br /> requirements, Cost $340,000,
<br />
<br />19, RELEVANT PROJECTS
<br />
<br />STANDARD FORM 330 (62004) PAGE 2
<br />Continuation Sheet
<br />
<br />-I
<br />
|