|
<br />12, NAME
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13, ROLE IN THIS CONTRACT
<br />
<br />Manuel A. Vega, P.E.
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326
<br />16, EDUCATION (DEGREE AND SPECIALlZA nON) 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />Senior Drainage Engineer
<br />
<br />14, YEARS EXPERIENCE
<br />a, TOTAL Ib, WITH CURRENT FIRM
<br />331 5
<br />
<br />BS/1975/Civil Eningeering, National University of Nicaragua
<br />MS/1977/Hydraulic Engineering, University of Nebraska
<br />MS/1983/Environmental Engineering, University of Michigan
<br />
<br />PE 40695 (1988) Florida
<br />PE 32117 (1986) Michigan
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, A wards, etc.)
<br />
<br />American Society of Highway Engineers
<br />
<br />1 9. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> State Road 816 (Oakland Park Blvd), from Powerline Road to Bayvie Drive PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> Browrd County, FL, FOOT District 4 2004 - 2009 2009
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Lead Drainage Engineer - Performed the pavement design on this Milling and Resurfacing project for FOOT 4, The project length is 3,0 miles. FM
<br /> #41379515201 Contact: Nadir Rodriques, PE (954) 777-4385. Cost $1,164,000.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FHWA Highway & Bridge Engineering, PRA-BLRI2D15, 2H13, J16 PROFESSIONAL SERVICES !CONSTRUCTION (If applicable)
<br /> Boone & West Jefferson, NC 2003 - 2009
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />Senior Drainage Engineer - These two projects consist of milling and surfacing and rehabilitating 13.3 miles and 19,1 miles of the Bule Ridge
<br /> Parkway, overlooks, parking areas, development areas and access roads. The project includes milling, pavement patching, stone curb
<br /> replacement, minor bridge repair and drainage improvements including evaluation, Contract 1 Cost $1,5 M, Contract 2 Cost $5 M,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Central Island Drainage and Street Improvements PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> City of Sunny Islea Beach, FL, Miami-Dade County 2005 - 2010
<br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Drainage Engineer for the Value Engineering Study and Final Design for this project, which was comprised of 26 drainage wells for drainage and
<br /> flood control and street rehabilitation. Contact: Rick Conner (305) 792-1928, Cost $
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> VA -Medical Center, New Offices & Warehouse PROFESSIONAL SERVICES ICONSTRUCTION (If applicable)
<br /> West Palm Beach, FL 2005 - 2007 2007
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />Drainage Engineer - BHA was the Engineer of Record for the Civil Plans of the Office-Warehouse building the VA-Medical Center, which includes
<br /> paving, grading, drainage, water and sewer. The paving included the design of parking areas of previous concrete as well as rigid pavement. Cost
<br /> $1,3 M,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Sunny Isles Beach Community School PROFESSIONAL SERVICES II CONSTRUCTION (If applicable)
<br /> Miami-Dade County, FL 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm
<br />e. Engineer of Record for the Drainage Design on the new school for Sunny Isles Beach, The Drainage design consists of 8-gravity deep well to drain
<br /> the 2,09 acres of school site plus 2,26 acres of surrounding streets for a total drainage area of 4,35 acres, Contact: Mr, Jorge Vera (305) 792-1912,
<br />
<br />STANDARD FORM 330 (62004) PAGE 2
<br />Continuation Sheet
<br />
|