Laserfiche WebLink
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person,) <br />13. ROLE IN THIS CONTRACT <br /> <br />Gustavo Garrido, PE, M.S.C.E. <br />15, FIRM NAME AND LOCATION (City and State) <br />Beiswenger, Hoch & Associates, Inc" 510 Shotgun Road, Suite 400, Sunrise, FL 33326 <br />16, EDUCATION (DEGREE AND SPECIALlZA TlDN) 17. CURRENT PROFESSIONAL REGISTRATION (SlA TE AND DISCIPLINE) <br /> <br />Senior Design Engineer <br /> <br />14, YEARS EXPERIENCE <br />a, TOTAL Tb. WITH CURRENT FIRM <br />201 6 <br /> <br />B,S,C,E, 11988/ Ricardo Palma University, Lima, Peru <br />Civil Engineer 11997 I Ricardo Palma University, Lima, Peru <br />M,S,C.E./19921 Pontifical Catholic University, Lima, Peru <br /> <br />Professional Engineer Florida - 67001 <br />Peru, South America - 46469 <br />Califomia (in process) <br /> <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Newport Fishing Pier PROFESSIONAL SERVICES1ICONSTRUCTION (If applicahle) <br /> City of Sunny Isles Beach 2010 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Member of the design team for the Newport Fishing Pier replacement in the City of Sunny Isles, The new replacement pier incorporate methos to <br /> reduce damage from storms and increase reliablity and performance of the structure, The structure, restaurant and railing meet ADA requirements <br /> and some amenities for fishing activities. The total cost of the project is $4,5 M <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 19th Street Mental Health Facility - ADA Renovations PROFESSIONAL SERVICESIICONSTRUCTION (If applicahle) <br /> 2677 NW 19th Street, Fort Lauderdale FL 33311 2008 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />Structural Engineer for the Interior & Exterior ADA Renovations: Architecture, Landscape, Civil, MEP + Fire. Building Area 12,750 S,F, Lot Area <br /> 0.96 Ac, Cost: $0.7 million. Construction Documents, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Jail Roof Smoke Hatches Replacement PROFESSIONAL SERVICESllCONSTRUCTION (If applicable) <br /> Broward County 2009 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Structural Designer for the Smoke Hatches Evacuation System replacement. Project Cost: $ - 0,5 M <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Broward County Main Library Interior Renovations PROFESSIONAL SERVICES}ICONSTRUCTION (If applicable) <br /> 2009 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE W Check if project performed with current firm <br />Structural Engineer for the design of new stair and escalators replacement at main lobby of Broward County Library. Cost $ 0,7M, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Broward County Fleet Service Center #8 PROFESSIONAL SERVICES~ICONSTRUCTION (If applicable) <br /> Pembroke Pines, FL 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lXJ Check if project performed with current firm <br />e. Structural Engineer for infrastructure update and renovation of two existing County Fleet Service Facilities to current code standards. <br /> <br />19. RELEVANT PROJECTS <br /> <br />ST ANDARD FORM 330 (6 2004) PAGE 2 <br />Continuation Sheet <br />