Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14, YEARS EXPERIENCE <br />Eduardo Lamas, AlA Project Manager a, TOTAL I b, WITH CUR9RENT FIRM <br /> 33 <br />15, FIRM NAME AND LOCATION (City and State) <br />Bermello Ajamil & Partners, Inc., Miami, Florida <br />16, EDUCATION (DEGREE AND SPECIALIZATION) 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Arfs in Archifecture, University of Miami, 1977 Registered Archifect, State of FL, Reg. No. AR 0008276 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Institute of Architects, Florida <br />American Institute of Architects, National <br /> 19, RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Aventura Communify Center PROFESSIONAL SERVICES I CONSTRUCTION IiI applicable) <br /> Aventura, Florida 2001 2003 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Master planner/Project Manager of a multi-use recreafional facility and waterfront park developmenf that is divided into athletic, ed- <br /> ucational, administrafive quarters and gathering spaces. Confains a 8,800 SF gym with a 150-person seating capacity. Managed all <br /> phases of the project, from master planning and architectural design stage through construction documentation & adminisfration. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Morgan Levy Park (formerly Doral Park) Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (il applicable) <br /> Doral, Florida 2005 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Manager for the design of 3 disfinct schemes represenfing the renovation of a 14.acre neighborhood park. The design <br /> incorporated active and passive recreation facilities, which included tennis courts, recreation building and a parking 101. Responsibilities <br /> included overseeing all phases of the project, from programming, design, construction documentation and administration. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Public Safety Complex PROFESSIONAL SERVICES I CONSTRUCTION IiI applicablel <br /> North Bay Village, Florida Ongoing <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE W Check if project performed wilh current firm <br /> Project Manager for the schematic design of a new public safety complex to replace the City's current City Hall and police station, <br /> both of which are in a state of disrepair. The new municipal complex will be built on 2,749 sq.ft. of land. It will house a City Hall with <br /> Council Chambers, a police station and fire rescue department, replacing the current unsafe facilities and will include a community <br /> center as well as an enclosed garage with safety features that can withstand a Category 5 hurricane. This facility will be designed <br /> for a Silver LEED classification. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Joseph Caleb Center Courthouse & Parking Garage PROFESSIONAL SERVICES I CONSTRUCTION IiI applicable) <br /> Miami, Florida Ongoing <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Manager for the design of additions fo the Caleb Center Courthouse and the design of its new Parking Garage facility. <br /> B&A will provide the programming and schematic design of the 37,000 SQ FT addition, including construction documenfation <br /> and administration. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Museum Garage PROFESSIONAL SERVICES I CONSTRUCTION IiI applicable) <br /> Coral Gables, Florida 2006 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE W Check if projecl performed with current firm <br /> Project Manager for an 8-story parking garage with more than 600 spaces, and retail space along the ground floor. An important <br /> challenge was to ensure that the design followed strict guidelines. A pedestrian promenade contributes to the continued <br /> revitalization of the area. Responsibilities included overseeing all phases of the project, from initial programming and architectural <br /> design phase through construction documentation and administration. <br /> <br />STANDARD FORM 330 (6/2004) <br />