|
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14, YEARS EXPERIENCE
<br />Eduardo Lamas, AlA Project Manager a, TOTAL I b, WITH CUR9RENT FIRM
<br /> 33
<br />15, FIRM NAME AND LOCATION (City and State)
<br />Bermello Ajamil & Partners, Inc., Miami, Florida
<br />16, EDUCATION (DEGREE AND SPECIALIZATION) 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Bachelor of Arfs in Archifecture, University of Miami, 1977 Registered Archifect, State of FL, Reg. No. AR 0008276
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Institute of Architects, Florida
<br />American Institute of Architects, National
<br /> 19, RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Aventura Communify Center PROFESSIONAL SERVICES I CONSTRUCTION IiI applicable)
<br /> Aventura, Florida 2001 2003
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Master planner/Project Manager of a multi-use recreafional facility and waterfront park developmenf that is divided into athletic, ed-
<br /> ucational, administrafive quarters and gathering spaces. Confains a 8,800 SF gym with a 150-person seating capacity. Managed all
<br /> phases of the project, from master planning and architectural design stage through construction documentation & adminisfration.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Morgan Levy Park (formerly Doral Park) Master Plan PROFESSIONAL SERVICES I CONSTRUCTION (il applicable)
<br /> Doral, Florida 2005 2007
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Project Manager for the design of 3 disfinct schemes represenfing the renovation of a 14.acre neighborhood park. The design
<br /> incorporated active and passive recreation facilities, which included tennis courts, recreation building and a parking 101. Responsibilities
<br /> included overseeing all phases of the project, from programming, design, construction documentation and administration.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Public Safety Complex PROFESSIONAL SERVICES I CONSTRUCTION IiI applicablel
<br /> North Bay Village, Florida Ongoing
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc,) AND SPECIFIC ROLE W Check if project performed wilh current firm
<br /> Project Manager for the schematic design of a new public safety complex to replace the City's current City Hall and police station,
<br /> both of which are in a state of disrepair. The new municipal complex will be built on 2,749 sq.ft. of land. It will house a City Hall with
<br /> Council Chambers, a police station and fire rescue department, replacing the current unsafe facilities and will include a community
<br /> center as well as an enclosed garage with safety features that can withstand a Category 5 hurricane. This facility will be designed
<br /> for a Silver LEED classification.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Joseph Caleb Center Courthouse & Parking Garage PROFESSIONAL SERVICES I CONSTRUCTION IiI applicable)
<br /> Miami, Florida Ongoing
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Project Manager for the design of additions fo the Caleb Center Courthouse and the design of its new Parking Garage facility.
<br /> B&A will provide the programming and schematic design of the 37,000 SQ FT addition, including construction documenfation
<br /> and administration.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Museum Garage PROFESSIONAL SERVICES I CONSTRUCTION IiI applicable)
<br /> Coral Gables, Florida 2006
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE W Check if projecl performed with current firm
<br /> Project Manager for an 8-story parking garage with more than 600 spaces, and retail space along the ground floor. An important
<br /> challenge was to ensure that the design followed strict guidelines. A pedestrian promenade contributes to the continued
<br /> revitalization of the area. Responsibilities included overseeing all phases of the project, from initial programming and architectural
<br /> design phase through construction documentation and administration.
<br />
<br />STANDARD FORM 330 (6/2004)
<br />
|