My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil & P. #3
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Bermello Ajamil & P. #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2010 9:33:08 AM
Creation date
12/1/2010 9:29:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12, NAME 13, ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Raul Carreras Job Captain a, TOTAL I b, WITH CUR;ENT FIRM <br /> 24 <br />15, FIRM NAME AND LOCATION (City and State) <br />Bermello Ajamil & Partners, Inc., Miami, Florida <br />16, EDUCATION (DEGREE AND SPECIALIZATION) 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Architecfure, University of Miami, 2001 <br />18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc,) <br /> 19, RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palmetto Bay Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Palmetto Bay, Florida 2007 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE [K] Check if project performed with current firm <br /> Projecf Manager during/responsible for Design Development, Construcfion Documenfs, Permit Procurement, Construcfion <br /> Administration for the development of this property for the new municipality consisfing of five parks; three will require upgrades <br /> while two others will require comprehensive landscaping, facilify and funcfion designs; 45-acre Coral Reef Park especially <br /> captures the characfer of the communify while addressing the needs of the village residents and surrounding neighborhood. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Morgan levy Park & Community Center PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Doral, Florida 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Manager during/responsible for Design Development, Construction Documents, Permit Procurement, and Construction <br /> Administration of three distincf design schemes for the renovation of the 14.acre Doral Park. In designing the renovations, an <br /> active and passive community center was developed, working within the confines of fhe existing site layout which included fennis <br /> courts, a recreation building and a parking lot. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Perrine Wayside Dog Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Palmetto Bay, Florida 2007 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc,) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Projecf Manager during/responsible for Schematic Design and Design Development for this 3-acre dog-oriented family park <br /> where "all" members of the family, including the family dogs can relax and enjoy the park afmosphere. The newly-enhanced <br /> facility features separate areas for small and large dogs with an attractive gazebo, new park furniture, and a large lake with a <br /> beautiful fountain in the center. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City Hall Feasibility Sfudy PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Palmetto Bay, Florida 2007 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE W Check if project performed with current firm <br /> Responsible for fhe preliminary needs assessmenf sfudy fhaf was done for the Village of Palmetto Bay. The vernacular style of the <br /> building relates to the surrounding area where the facility is located. The two story mass is celebrated with a four story tower which <br /> is crowned with a look ouf terrace. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Joseph Caleb Center Courthouse & Parking Garage PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida Ongoing <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc,) AND SPECIFIC ROLE W Check if project performed with current firm <br /> Job Captain for the design of additions to the Caleb Center Courthouse and the design of its new Parking Garage facility. B&A <br /> will provide the programming and schematic design of the 37,000 SQ FT addition, including construction documentation and <br /> administration. <br /> <br />STANDARD FORM 330 (612004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.