Laserfiche WebLink
<br />/./ <br /> <br />.,- <br />,- I <br /> <br />. , <br />" <br /> <br />Coastal Construction Company <br />5959 Blue Lagoon Drive, #200 <br /> <br />Subcontract Change.Order <br />No. 00001 <br /> <br />Miami, FL 33126 <br /> <br />Phone: 305.559.4900 <br />Fax: 305.221.5005 <br /> <br />TITLE: <br /> <br />Cole Industrial DPO#8 <br /> <br />DATE: <br /> <br />PROJECT: Heritage Par:k and Parking Garage <br /> <br />8/3/2010 <br /> <br />JOB: 01-5928 <br /> <br />CONTRACT NO: 01-5928-0103 <br />TYPE OF: <br /> <br />OCO# <br /> <br />Owner e.O. <br />n/a <br /> <br />;' ~. ,','j". a.:. '. -. -. <br />Attn: !'lajib B. "Duke" Halwa <br /> <br />Dynamic Environmental Drilling, Inc. <br /> <br />1825 Ponce De Leon Blvd <br /> <br />#277 <br /> <br />Coral Ga~les, FL 33134 <br /> <br />Phone:305.4~6.0737 Fax: 305.235.0202 <br />i; f ....;:;;i.. \o...-:rl'(i,.~'-'.1"; '. <br />b_Gj!:~~~~~~lf\~~r.;~~S'"~~~ml~W~~~ <br /> <br />TO: <br /> <br />, -~ .:~.~ <br /> <br />~-~ - <br /> <br />0000 I DPO for Material: 500 ft of pipe for ten (I O)wells ($23,000.00) <br /> <br />00002 <br /> <br />Tax for material:500 ft of pipe for len (10) wells <br /> <br />(S 1.430.00) <br /> <br />Total: <br /> <br />($24,430.00) <br /> <br />t. It is understood and agreed thai the acceptance for this Change Order by .his Subcon'n1ctor constilules an accord and satisfaction wi.h the term. of this Change Order. <br />2. The amount of the Change Order coven all direct and indirect costs. <br />J. It is further underslood and agreed thaI all temu and conditions of said Conlr.lct. as it may therefore have be:en modified shall be: and remain the same. <br />4. Acceptance of the Change Order acknowledges accoplance of all previous Change Orde.. worle by the Subonlractor and Cootraclor as well as any adjustments 10 the Subcontractor amounl <br />and modificatioIU as ",Oecled above. <br />5. This Change Order includes all items necessary for a complete insrallation including bul not necessarily limited to labor, supervision, malerial'!, transportation. incidentals., taxes, and any <br />other items nee<asary for a complete inslallalion. <br /> <br />The 0 rigin a I Con tract Sum was .......... ..... .............. ...................... ................ ............... .... ........... <br /> <br />Net Change by Previously Authorized Requests and Changes ................................................ <br />The Contract Su.m Prior to This Change Order was <br />The Con tract Su m Will be Dec rea sed ............................. ...................................................... <br />The New Contract Sum-Including This Change Order <br />The Con tract Time Will Not Be Ch anged ................................................................................. <br />The Date of Substantial Completion as of this Change Order Therefore is <br /> <br />$84,000.00 <br />$0.00 <br />$84,000.00 <br />($24,430.00) <br />$59,570.00 <br /> <br />ACCEPTED: <br /> <br />Dynamic Environmental Drilling, I <br />By: (\. ~ '- ---=:l' <br />Najib B. "Duke" Halwa <br />Date: '\ /Gf... / In <br />, t <br /> <br />~;~st~ <br /> <br />" Ed nallin <br />Date: C\- ~ '-\.:. d) <br />