Laserfiche WebLink
<br />../ <br /> <br />o <br /> <br />n <br /> <br />Coastal Construction Company <br />5959 Blue Lagoon Drive. #200 <br /> <br />Subcontract Change Order <br />No. 00001 <br /> <br />Miami, FL 33126 <br /> <br />Phone: 305.705.9066 <br />Fax: 305.705.9069 <br /> <br />TITLE: <br /> <br />DPO #9-Elevator Construction Mat'l <br /> <br />DATE: <br />JOB: <br /> <br />9/9/2010 <br />01-5928 <br /> <br />PROJECT: Heritage Park and Parking Garage <br /> <br />TO: <br /> <br />Attn: leLainya Koutereba <br />Otis Elevator Company <br />16200 NW 59th Ave. <br />Suite 109 <br />Miami Lakes, FL 33014 <br />Phone: 305.816.5779 Fax: 860.660.0643 <br /> <br />CONTRACT NO:01-5928-0106 <br />TYPE OF: <br />OCO# <br /> <br />Scope <br />NA <br /> <br />DESCRIPTION OF CHANGE <br /> <br />Item <br />00001 <br /> <br />Description <br /> <br />DPO #9 for material: All materials needed for the <br />construction of the elevalO~ at Heritage Park <br />Tax for material: TBJ{ as determined by Otis, confirmed <br />in their letter dated 8/12/20 I 0 <br /> <br />Amount <br /> <br />(SI0I,187.oo) <br /> <br />00002 <br /> <br />(S4.541.34 ) <br /> <br />Total: <br /> <br />(S I 05,728..34) <br /> <br />I. It is understood and agJtX:d that the IICCcpuncc fur this Change Order by this Subcootractor constitutes an accord and sati.sfactiOCl with the tcmu of this Change Order. <br /> <br />2. The IIlXlWIt of the Change Order coven all direct and indirect costs. <br />J. It is further understood and agJtX:d that all tcmu and conditiOClI of said Conlnct, as it may ~f= have been modified sball be: and remain the ,"",c. <br /> <br />4. Acceptance of the Change Order acknowledges acceptance or all prcviow Change Ordc", wor\< by the Subontmctor and CoolrBClOr as well as any adjuslmenUl to the SubcontrnclOr amount <br />and modi6catiexu as rcfla:t.ed above. <br /> <br />5. ThiJ Change Order includes all items necessary for a complete installation including but noInecessarily timiled to labor, .upcrvi.ioo. materials, lr.msportalion. incidentals, taxes. and any <br />Olber item. necessary for a complete instaII.tiOCl. <br /> <br />~d\Y~ <br /> <br />The Original Contract Sum was ................................................................................................. <br /> <br />Net Change by Previously Authorized Requests and Changes ................................................ <br />The Contract Sum Prior to This Change Order was <br />The Contract Sum Will be Decreased ................................................................................... <br />The New Contract Sum Including This Change Order <br />The Contract Time Will Not Be Changed ................................................................................. <br />The Date of Substantial Completion as of this Change Order Therefore is <br /> <br />$177,500.00 <br />$0.00 <br />$177 ,500.00 <br />($105,728.34 ) <br />$71,771.66 <br /> <br />ACCEPTED: <br /> <br />Otis Elevator Company <br />By: <br /> <br />leLainya Koutereba <br /> <br />Coastal Construction Company <br /> <br />By: .', <br />Gunnar Mandrisch <br /> <br />Date: <br /> <br />Date: <br />