Laserfiche WebLink
NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br />C. EQUIPMENT <br />x $ c� v <br />ou <br />$ <br />Cl <br />One Front End Loader with Backhoe, including an <br />250 Hours <br />Operator <br />O <br />Per Hour <br />C2 <br />One Front End Loader with Backhoe, including an <br />30 Days <br />Operator <br />Per Day <br />x $ <br />$ <br />C3 <br />One Front End Loader with Backhoe, including an <br />4 Weeks <br />-,7 0c) 0, oo <br />Operator <br />Per Week <br />�i <br />x $ <br />$ <br />C4 <br />One Front End Loader with Backhoe, including an <br />1 Month <br />of 00 <br />Operator <br />Per Month = <br />0 00.0 <br />C5 <br />One 15,000 GVW (or larger) Dump Truck with an <br />100 Hours <br />Operator <br />Per Hour <br />C6 <br />One 15,000 GVW (or larger) Dump Truck with an <br />10 Days <br />Operator <br />Per Day = <br />Sop r_ <br />C7 <br />One 15,000 GVW (or larger) Dump Truck with an <br />1 Week <br />Operator <br />Per Week <br />x $ <br />$ <br />C8 <br />One 15,000 GVW (or larger) Dump Truck with an <br />1 Month <br />Operator <br />Per Month <br />x $ <br />$ <br />Cg <br />One Trailer Mounted Water Tank (500 gallon <br />20 Days <br />%6 D� <br />minimum) with Pump and Hose Reel <br />Per Day <br />�j <br />C10 <br />One Trailer Mounted Water Tank (500 gallon <br />2 Weeks <br />;71�� <br />minimum) with Pump and Hose Reel <br />Per Week = <br />i <br />PACE 58 OF 105 <br />PROPOSAL NO. <br />>o <br />