Laserfiche WebLink
NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br />X $ <br />$ <br />C11 <br />One Trailer Mounted Water Tank (500 gallon <br />1 Month <br />9 cOOO. 04D <br />minimum) with Pump and Hose Reel <br />Per Month = <br />� 000,0, <br />C12 <br />One Self Propelled 24" Deep by 6" Wide Trencher <br />50 Hours <br />with an Operator <br />Per Hour = <br />C�C�p. 0 <br />C13 <br />One Self Propelled 24" Deep by 6" Wide Trencher <br />5 Days <br />y <br />with an Operator <br />Per Day = <br />00 <br />� <br />X $ <br />$ <br />C14 <br />One Self Propelled 24" Deep by 6" Wide Trencher <br />2 Weeks <br />-'�Z <br />with an Operator <br />Per Week = <br />� �fj�j , C <br />X $ <br />$ <br />C15 <br />One Self Propelled 24" Deep by 6" Wide Trencher <br />1 Month <br />y c XJ <br />with an Operator <br />Per Month = <br />/� <br />7 ';>p <br />X $` - 00 <br />$ <br />C16 <br />Bucket Truck (equipment only) <br />50 Hours <br />Per Hour = <br />�,SVv r <br />X $ <br />C17 <br />Chipper Brush (equipment only) <br />50 Hours <br />Per Hour <br />X $ <br />C18 <br />Stump Grinder(equipment only) <br />50 Hours <br />Per Hour = <br />ce-'O, cr <br />Grapple Loader <br />C19 <br />(30 cubic yard capacity, <br />50 Hours <br />equipment only) <br />Per Hour = <br />$ <br />C <br />SUBTOTAL <br />C, <br />Y� <br />PACE 59 OF 105 <br />PROPOSAL NO. <br />