Laserfiche WebLink
• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br />C. EQUIPMENT <br />C1 <br />One Front End Loader with Backhoe, including an <br />250 Hours <br />�� 1• <br />Operator <br />Per Hour = <br />X $ <br />$ <br />C2 <br />One Front End Loader with Backhoe, including an <br />30 Days <br />Operator <br />Per Day = <br />One Front End Loader Backhoe, including <br />X $ <br />`4 <br />(Vcoa <br />C3 <br />with an <br />4 Weeks <br />Operator <br />Per Week = <br />C4 <br />One Front End Loader with Backhoe, including an <br />1 Month <br />X $ <br />I <br />$q <br />1j <br />Operator <br />Per Month = <br />X $ S7d (,.I <br />E� <br />C5 <br />One 15,000 GVW (or larger) Dump Truck with an <br />100 Hours <br />s <br />Operator <br />Per Hour = <br />X $ L46 CC, <br />$ <br />C6 <br />One 15,000 GVW (or larger) Dump Truck with an <br />10 Days <br />t cc <br />Operator <br />�1L6C <br />Per Day = <br />X $s <br />C7 <br />One 15,000 GVW (or larger) Dump Truck with an <br />i Weeks <br />Operator <br />Per Week = <br />One 15,000 GVW (or larger) Dump Truck with an <br />X <br />C.0 <br />$ <br />C8 <br />Operator <br />1 Month <br />Per Month = <br />X <br />$ <br />C9 <br />One Trailer Mounted Water Tank (500 gallon <br />20 Da <br />Days <br />y <br />CC <br />2 i <br />minimum) with Pump and Hose Reel <br />Per Day = <br />X <br />$ <br />C10 <br />One Trailer Mounted Water Tank (500 gallon <br />2 Weeks <br />minimum) with Pump and Hose Reel <br />Per Week = <br />PAGE 58 OF 105 <br />PROPOSAL N0. <br />rid <br />V <br />I <br />•t. <br />