My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SFM #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-11-01 Landscape Maintenance Services
>
Responses
>
SFM #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 7:00:14 AM
Creation date
12/21/2010 1:30:27 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Svcs.
Bid No. (xx-xx-xx)
10-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />• <br />• <br />i <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />i <br />• <br />• <br />• <br />• <br />• <br />a <br />• <br />• <br />s <br />• <br />i <br />• <br />• <br />• <br />NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he /she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br />C11 <br />One Trailer Mounted Water Tank (500 gallon <br />1 Month <br />x$ <br />�� <br />q <br />minimum) with Pump and Hose Reel <br />/ <br />Per Month = <br />C12 <br />One Self Propelled 24" Deep by 6" Wide Trencher <br />50 Hours <br />with an Operator <br />Per Hour = <br />One Self Propelled 24" Deep by 6" Wide Trencher <br />X $/1iqc� <br />` <br />`" <br />� <br />C13 <br />5 Days <br />with an Operator <br />Per Day <br />x $I 1 <br />C14 <br />One Self Propelled 24" Deep by 6" Wide Trencher <br />2 Weeks <br />' <br />°'•" <br />7 <br />with an Operator <br />Per Week = <br />C15 <br />One Self Propelled 24" Deep by 6" Wide Trencher <br />1 Month <br />x $ fi/�cc <br />$ R <br />c . <br />with an Operator <br />Per Month = <br />$'-7Xi <br />x $` crc <br />C16 <br />Bucket Truck (equipment only) <br />50 Hours <br />Per Hour = <br />X $ ' Ot? <br />p � <br />C17 <br />Chipper Brush (equipment only) <br />50 Hours <br />Per Hour = <br />x <br />C18 <br />Stump Grinder(equipment only) <br />50 Hours <br />Per Hour = <br />Grapple Loader <br />x $ Ss. pd <br />$ <br />C19 <br />(30 cubic yard capacity, <br />50 Hours <br />equipment only) <br />Per Hour = <br />$ <br />C <br />SUBTOTAL <br />PAGE 59 OF 105 <br />PROPOSAL N0. <br />re, <br />gwa <br />�C, <br />
The URL can be used to link to this page
Your browser does not support the video tag.