Laserfiche WebLink
• Winn -Dixie Market Place: SW 137' Avenue & 184' Street, Miami, Fl. <br />Owner: Konover Construction Corp., 700 W. Hillsboro Blvd., Deerfield Beach, Fl. 33441 <br />Contact Person: Ed McWorters Phone #(561)447 -4482 <br />Contract Amount: $1,031,185.00 <br />Length of Contract: 270 Days <br />Scope of Work: Excavate, fill, grade and compact site; Install underground utilities; Add <br />Turn Lanes on SW 137` Avenue including concrete curb and gutter; Install concrete <br />curbs and gutter for new parking areas; Asphalt paving; Pavement marking and signs. <br />NE 18/19 Avenue from 163 Street to Miami Gardens Drive/ Project 671307 <br />Owners: Dade County Public Works Department, 111 NW 1 st Street, Miami, Florida <br />Contact Person: John Ritsema or Javier Bustos Phone #(305)372 -2113 <br />Contract Amount: $2,292,442.75 <br />Length of Contract: 270 Calendar days <br />Scope of Work: Roadway widening and improvements, including the widening of an <br />existing bridge with new spans including pilings, bridge deck, barrier walls and railings. <br />The project also includes demolition, clearing, excavation, grading, paving, street <br />lighting, signalization, roadway signs and pavement markings. <br />SW 155 Ave from SW 232 ST to SW 228 ST./Project 647070 <br />Owner: Dade County Public Works Department <br />111 NW 1" Street <br />• Contact Person: John Ritsema or Javier Bustos <br />Contract Amount: $159,879.96 <br />Length of Contract: 60 Calendar Days <br />Scope of Work: Constructing a 8" thick, 24' wide compacted limerock base, overlaid <br />with a 1 " thick, 20' wide asphaltic concrete surface course. <br />HOMESTEAD MOTORSPORTS OVAL TRACK RECONFIGURATION: <br />Owner: Bentancourt Castellon Associates, 7355 SW 87 Avenue, Miami, Florida 33172 <br />Contact Person: David Woodford Phone #(305)598 -2932 <br />Contract Amount: $2,900,000.00 <br />Length of Contract: 210 Days <br />Scope of Work: Auto race track reconfiguration which includes the demolition of the <br />existing crash wall in all turns, importing fill material, placement of fill materials, grading, <br />compaction, drainage, and limerock base courses. This project is a complete redo of <br />the track's banking and turn configuration. <br />• <br />