Laserfiche WebLink
• S. W. 117th Avenue Roadway Improvements/Project #662283 <br />(honer: Dade County Public Works Department, 111 NW 1st Street, Miami, FL 33128 <br />Contact Person: John Ritsema or Henry Phone #(305)375 -2135 <br />Contract Amount: $4,370,753.37 <br />Length of Contract: 360 calendar days <br />Scope of Work: Roadway improvements to SW 117th Avenue, from SW 152nd Street to <br />SW 104th Street, which includes clearing of additional right -of -way; removing existing <br />asphalt and concrete curbs, new drainage system; adjusting and/or relocating existing <br />utilities; roadway subgrade stabilization; new concrete curb and gutters; limerock base <br />course, asphalt surface course, construction of approach aprons and roadway bridge; new <br />street lighting system; new traffic signals; pavement markings and signage. <br />Royal Palm Gardens Apartments <br />Owner: Current Builders Construction Co., 2251 Blount Road, <br />Pompano Beach, FL 33069 <br />Contact Person: Dave Pitter or Chip Reid Phone #(305)977 -4211 <br />Contract Amount: $611,875.00 <br />Length of Contract: (Per Owner's requirements) <br />Scope of Work: Site clearing and demolition; site grading including importing of required <br />fill materials, grading, and compaction; control fill, grading and compaction of building pad <br />areas; storm drainage system including installing catch basins, drain piping, and exfiltration <br />trenches; subgrade stabilization of driveways and parking areas; limerock base course for <br />• driveways and parking areas, concrete curbs; asphalt surface course; pavement markings and <br />signage. <br />N. W. 72nd Avenue Roadway Improvements/Project #671907 <br />Owner: Dade County Public Works Dept., 111 NW 1 st Street, Miami, FL 33128 -1970 <br />Contact Person: John Ritsema or Henry Tobar Phone #(305)375 -2135 <br />Contract Amount: $3,618,332.84 <br />Length of Contract: 360 calendar days <br />Scope of Work: Roadway improvements from Okeechobee Road to N. W. 122nd Street, <br />including site demolition, clearing, tree removal, and tree relocations; grading of new <br />roadway; installation of drainage system; adjusting and/or relocating existing underground <br />utilities; roadway subgrade stabilization; limerock base course; new concrete curb and <br />gutter; asphalt surface course; new street lighting system; new traffic signalizationsystem; <br />pavement marking and signage; landscaping, including sod and new tree planting. <br />• <br />