Laserfiche WebLink
• Jordan Commons <br />Owner: Habitat for Humanity -- Largest project for Habitat in the United States <br />10 Palms Plaza <br />Homestead, FL 33030 <br />Contact Person: Dick Weber Phone 9(305)247 -0847 <br />Contract Amount: $2,341,744.86 <br />Length of Contract: 360 days <br />Scope of Work: Complete 50 -acre site development, including clearing and grubbing, <br />burning, road excavation, building pads construction; subgrade and limerock construction, <br />asphalt and concrete pavement. Complete water and sewer distribution system and storm <br />drainage system. <br />S. W. 344th Street (Palm Dr.) Roadway Improvements <br />Owner: City of Florida City, 404 West Palm Drive, Florida City, FL 33034 <br />Contact Person: Kenneth W. Schang, Consulting Engr. Phone #(305)670 -1011 <br />Contract Amount: $903,821.94 <br />Length of Contract 125 calendar days <br />Scope of Work: Same as above, including 101" culvert installation and permitting with <br />South Florida Water Management and Dade County DERM approvals. <br />Keysgate Subdivision Infrastructure & Excavation <br />Owner: Florida Design Communities, 1820 South Canal Drive, Homestead, FL 33035 <br />• Contact Person: Allan Clark Phone #(305)245 -3030 <br />Contract Amount: $2,300,140.00 <br />Length of Contract: 180 days <br />Scope of Work: Complete land development of 65 -acre site previously determined as a <br />wetland area, with upland features; Clearing and grubbing of 65 acres. Dragline excavation <br />of 500,000 ( + / -) cubic yards of limerock materials and placement of same; complete with <br />water, sewer and distribution system. Storm drainage construction, roadway construction <br />consisting of subgrade limerock base and asphalt surface course. <br />S. W. 152nd Street/Project #671500 <br />Owner: Dade County Public Works Dept., 111 NW 1st Street, Miami, FL 33128 -1970 <br />Contact Person: John Ritsema or Henry Tobar Phone #(305)375 -2135 <br />Contract Amount: $1,205,158.94 <br />Length of Contract: 200 calendar days <br />Scope of Work: Roadway improvements to SW 152nd Street, which includes clearing of <br />additional right -of -way; removing existing asphalt and concrete curbs; new drainage <br />system; adjusting and /or relocating existing utilities; roadway subgrade stabilization, new <br />concrete curb and gutters; limerock base course; asphalt surface course; new street lighting <br />system, new traffic signals; pavement markings and signage. <br />• <br />