My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redland #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 01-12-01 Golden Shores Drainage
>
Redland #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 4:39:16 AM
Creation date
12/29/2010 2:05:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Drainage
Bid No. (xx-xx-xx)
01-12-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Hainlin Mill Apartments <br />Owner: Current Builders Construction Co. <br />Contact: Chip Reid Phone #(305)977 -4211 <br />Contract Amount: $510,209.00 <br />Date Completed: 1995 <br />Scope of Work: 15 -acre site development; site clearing and demolition; site grading <br />including importing of required fill materials, grading, and compaction; control fill, grading <br />and compaction of building pad areas; storm drainage system including installing catch <br />basins, drain piping, and exfiltration trenches; subgrade stabilization of driveways and <br />parking areas; limerock base course for driveways and parking areas; concrete curbs; asphalt <br />surface course; pavement markings and signage. <br />Villa Biscayne Apartments <br />Owner: Royal Construction Co. <br />Contact: Harry Smith Phone ( #(305)248 -4750 <br />Contract Amount: $617,827.00 <br />Date Completed. 1995 <br />Scope of Work: 10 -acre site development; site clearing and demolition; site grading <br />including importing of required fill materials, grading, and compaction; control fill, <br />grading and compaction of building pad areas; storm drainage system including installing <br />catch basins, drain piping, and exfiltration trenches; subgrade stabilization of driveways <br />• and parking areas; limerock base course for driveways and parking areas <br />Homestead III Apartments <br />Owner: Current Builders Construction Co <br />Contact: Chip Reid Phone #(305)977 -4211 <br />Contract Amount: $1,118,897.00 <br />Date Completed: 1995 <br />Scope of Work: 10 -acre site development; site clearing and demolition; site grading <br />including importing of required fill materials, grading, and compaction; control fill, <br />grading and compaction of building pad areas; storm drainage system including installing <br />catch basins, drain piping, and exfiltration trenches; subgrade stabilization of driveways <br />and parking areas; limerock base course for driveways and parking areas. <br />Florida Keys Factory Shops/Phase 1 <br />Florida City, Florida <br />Contact: Allan Kofedt Phone #(410)234 -0782 <br />Owner: The Prime Group 1- 800 - 628 -9467 <br />Contract Amount: $2,087,923.00 <br />Date Completed. 1995 <br />Scope of Work: 26 -acre site development; Clearing and grubbing and burning onsite. Lake <br />excavation of 250,000 cubic yards and placement of same onsite. Construction of 100,000 <br />square yards of paved areas; water, sewer, pump station and storm drainage. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.