My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Weitz
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(01-12-02) Const. Mgr. for new City Hall
>
The Weitz
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2012 9:59:05 PM
Creation date
12/29/2010 2:49:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Const. Mgmt. for City Hall
Bid No. (xx-xx-xx)
01-12-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�I11 <br />a. <br />nni <br />ti n� <br />VIII CRESCENT <br />Englewood, Colorado <br />11 RRIt� RR Rp _R' <br />P <br />FACILITY TYPE Office Building <br />CLIENT Denver Technological Center <br />Englewood, Colorado <br />DESIGNER Michael Barber P.C. Architecture <br />Denver, Colorado <br />SIZE 90,700 s. f. <br />FEATURES Schedule was the driving force behind this 4 <br />story precast office building. Fast tracking the <br />project, Weitz constructed and made ready for <br />occupancy over 90,000 square foot of space in <br />just under seven months. The 14 acre project <br />site showcases a fountain, an amphitheater and <br />a bike path. <br />
The URL can be used to link to this page
Your browser does not support the video tag.