Laserfiche WebLink
SECTION 01660 <br />FACILITY TESTING <br />FIELD TESTS <br />As soon as conditions permit, the CONTRACTOR shall furnish all labor, materials, and instruments and shall perform <br />field tests of installed items. If the field tests disclose any item of Work under this contract which does not comply with <br />the requirements of the contract documents the CONTRACTOR shall, prior to the acceptance testing or continuation <br />of portions or the Work as determined by the ENGINEER, make all changes, adjustments, and replacements required. <br />Water, sanitary sewer and storm drainage improvements constructed under this contract will be subject to, as a minimum, <br />the following tests: <br />FINAL FIELD TESTS <br />Upon completion of the Work and prior to final payment, all items of Work under this contract shall be subject to <br />acceptance tests as specified or required by the ENGINEER to comply with the contract documents. <br />The CONTRACTOR shall furnish labor, fuel, energy and all other materials, equipment and instruments necessary for <br />all acceptance tests, at no additional cost to the OWNER. <br />END OF SECTION <br />01660-1 <br />