Laserfiche WebLink
1 <br />When such charges are normally made by the CITY and when so stated in the Special Conditions, there will be no charges <br />to the CONTRACTOR. The CITY shall assist the CONTRACTOR, when necessary, in obtaining such permits and <br />' licenses. The CONTRACTOR will also pay all public utility charges. <br />Electrical Power and Lighting: <br />6.16 Electrical power required during construction shall be provided by each prime CONTRACTOR as required by <br />them. This service shall be installed by a qualified electrical Contractor approved by the CONSULTANT. Lighting shall <br />be provided by the CONTRACTOR in all spaces at all times where necessary for good and proper workmanship, for <br />' inspection or for safety. No temporary power shall be used off temporary lighting lines without specific approval of the <br />CONTRACTOR- <br />Laws and Regulations: <br />6.17 The CONTRACTOR will give all notices and comply with all laws, ordinances, rules and regulations applicable <br />to the Work. If the CONTRACTOR observes that the Specifications or Drawings are at variance therewith, they will <br />give the CONSULTANT prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate <br />modification. If the CONTRACTOR performs any Work knowing it to be contrary to such laws, ordinances, rules and <br />regulations, and without such notice to the CONSULTANT, they will bear all costs arising therefrom; however, it shall <br />not be their primary responsibility to make certain that the Drawings and Specifications are in accordance with such laws, <br />ordinances, rules and regulations. <br />' Taxes: <br />6.18 Cost of all applicable sales consumer, use, and other taxes for which the CONTRACTOR is liable under the <br />' Contract shall be included in the Contract Price stated by the CONTRACTOR- <br />Record Drawings: <br />' 6.19 The CONTRACTOR will keep one record copy of all Specifications, Drawings, Addenda, Modifications and Shop <br />Drawings at the site in good order and annotated to show all changes made during the construction process. These shall <br />be available to the CONSULTANT and any City Representative at all reasonable times and shall be delivered to the CITY <br />upon completion of the Project. <br />Safety and Protection : <br />6.20 The CONTRACTOR will be responsible for initiating, maintaining and supervising all safety precautions and <br />programs in connection with the Work. They will take all necessary precautions for the safety of, and will provide the <br />necessary protection to prevent damage, injury or loss to: <br />' 6.20.1 All employees and other persons who maybe affected thereby, <br />6.20.2 All the Work and all materials or equipment to be incorporated therein, whether in storage on or off the <br />' site, and <br />6.20.3 Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, <br />' roadways, structures and utilities not designated for removal, relocation or replacement in the course of <br />construction. <br />6.21 The CONTRACTOR will designate a responsible member of their organization at the site whose duty shall be the <br />prevention of accidents. This person shall be the CONTRACTOR'S Superintendent unless otherwise designated in <br />writing by the CONTRACTOR to the CITY. <br />'00710-11 <br />1 <br />