My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-04-01) Entrance Signage
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:10:10 AM
Creation date
1/5/2011 4:31:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Entrance Signage
Bid No. (xx-xx-xx)
03-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Emergencies: <br />1 <br />1 <br />6.22 In emergencies affecting the safety of persons or the Work or property at the site or adjacent thereto, the <br />CONTRACTOR, without special instruction or authorization from the CONSULTANT or CITY, is obligated to act, at <br />their discretion, to prevent threatened damage, injury or loss. They will give the CONSULTANT prompt written notice <br />of any significant changes in the Work or deviations from the Contract Documents caused thereby. If the <br />CONTRACTOR believes that additional Work done by them in an emergency which arose from causes beyond their <br />control entitles them to an increase in the Contract Price or an extension of the Contract Time, they may make a claim <br />therefore as provided in articles 11 and 12. <br />Shop Drawings and Samples: <br />6.23 After checking and verifying all field measurements, the CONTRACTOR will submit to the CONSULTANT for <br />review, in accordance with the accepted schedule of shop drawing submissions six (6) copies (or at the <br />CONSULTANT'S option, one reproducible copy) of all Shop Drawings, which shall have been checked by and stamped <br />with the approval of the CONTRACTOR and identified as the CONSULTANT may require. The data shown on the <br />Shop Drawings will be complete with respect to dimensions, design criteria, materials of construction and the like to <br />enable the CONSULTANT to review the information as required. <br />6.24 The CONTRACTOR will also submit to the CONSULTANT for review, with such promptness as to cause no <br />delay in Work, all samples required by the Contract Documents. <br />All samples will have been checked by and stamped with the approval of the CONTRACTOR, identified clearly as to <br />material, manufacturer, any pertinent catalog numbers and the use for which intended. <br />6.25 At the time of each submission, the CONTRACTOR will in writing call the CONSULTANT'S attention to any <br />deviations that the Shop Drawings or sample may have from the requirements of the Contract Documents. <br />6.26 The CONSULTANT will review with responsible promptness Shop Drawings and Samples, but their review shall <br />be only for conformance with the design concept of the Project and for compliance with the information given in the <br />Contract Documents. The review of a separate item as such will not indicate review of the assembly in which the items <br />functions. The CONTRACTOR will make any corrections required by the CONSULTANT and will return the required <br />number of corrected copies of Shop Drawings and resubmit new samples until the review is satisfactory to the <br />CONSULTANT. The CONTRACTOR shall direct specific attention in writing or on resubmitted Shop Drawings to <br />revisions other than the corrections called for by the CONSULTANT on previous submissions. The CONTRACTOR'S <br />stamp of approval on any Shop Drawings or sample shall constitute representation to the CITY and the <br />CONSULTANT that the CONTRACTOR has either determined and verified all quantities, dimension, field <br />construction criteria, materials, catalog numbers and similar data or they assume full responsibility for doing so, and <br />that they have reviewed or coordinated each Shop Drawing to sample with the requirements of the Work and the <br />Contract Documents. <br />6.27 No Work requiring a Shop Drawing or sample submission shall be commenced until the submission has been <br />reviewed by the CONSULTANT. A copy of each Shop Drawing and each approved sample shall be kept in good order <br />by the CONTRACTOR at the site and shall be available to the CONSULTANT. <br />6.28 The CONSULTANT'S review of Shop Drawings or samples shall not relieve the CONTRACTOR from their <br />responsibility for any deviations from the requirements of the Contract Documents unless the CONTRACTOR has in <br />writing called the CONSULTANT'S attention to each deviation at the time of submission and the CONSULTANT <br />has given written approval to the specific deviation, nor shall any review by the CONSULTANT relieve the <br />CONTRACTOR from responsibility for errors or omission in the Shop Drawings. <br />Cleaning up : <br />00710-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.