My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />18.2 <br />18.3 <br />18.4 <br />18.5 <br />lowest <br />onsible <br />It is the intent of the Owner to award awith the B dd ng Documents <br />Total Base Bidder whose Bid is in conformance <br />and does not exceed the funds available. <br />Upon acceptance of a Bid and award thwithsrequ re�dtbonds and an Bother <br />shall deliver the executed Contract, along <br />items requested, to the Owner within <br />Bidder and result sult in forfeiture of bid <br />deemed as a breach of agreement by the <br />security as described in the Instructions to Bidders. <br />The Owner reserves the right to hold all proposals and bid guarantees for a <br />period not to exceed 90 days after the date of bid opening stated in the <br />Advertisement for Bids. <br />onsible <br />The award of the contract, if it is awarded, will be to the loest <br />the award w II be tosphe best <br />total base bidder whose qualificatio ns indicate proposal shall comply with the <br />interest of the Owner and whose p ro p <br />requirements of the Contract Documents. Tim if isetfbt the <br />the essence for is <br />project and the time limits set in the proposal, <br />In <br />accorded weight by the Owner in the determination in the best pr have been <br />no case will the award be made until all necessary 9 <br />made into the responsibility of the low e the Owner is satis <br />organ zat ont <br />the bidder is qualified to do the Work and hav <br />capital and equipment to carry out the provisions of the contract to the <br />satisfaction of the Owner within the time specified. the bid <br />18.7 If the Contractor feels that a problem exists either <br />of the biddopenng) and <br />opening, he shall contact the City (within <br />follow the Citys' current policy for bid protests. <br />18.8 The Owner reserves the right to award as a total contract any combination <br />of the Unit Price Bid Schedule Items that would be in the best interest of the <br />Owner. <br />CASH ALLOWANCES <br />The Bidder is advised that a space is provided in the Bid Form, Document <br />00300, for this purpose only. The Contractor shall not proceed on any <br />by <br />additional work to be covered by allowances <br />byuntil <br />theaOwneresha1l be Iw hin <br />the Engineer. Such work shall be approved <br />unt <br />the scope of work defined by this Contract Allowanceowill <br />indicated in the Bid Form. Any amount ema'ningn <br />be retained by the Owner. <br />19.1 <br />END OF DOCUMENT <br />00100 -8 03- 4138.A -R <br />09103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.