My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />' in the year 2003 by and <br />s of _ day of and <br />THIS AGREEMENT ITY OF SUNNY ISLES BEACH (hereinafter called OWNER) <br />' between <br />hereinafter called CONTRACTOR). <br />iOWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />I <br />Article 1. WORK. The <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. <br />Work is generally described as follows: <br />Sunny Isles Beach Entrance Signs (Electrical) <br />Article 2. ENGINEER. <br />has been designed by: CALVIN, GIORDANO &ASSOCIATES, INC. <br />Project 1 1800 Eller Drive, Suite 600 <br />Fort Lauderdale, Florida 33316 <br />who is hereinafter called ENGINEER and who is to act as OWNER'S representative, <br />ENGINEER'i ethe Contract <br />duties and responsibilities and have the rights and authority assigned <br />Documents in connection with completion of the Work in accordance with the Contract <br />Documents. <br />Article 3. CONTRACT TIMES. <br />work will be substantially completed within r p days after fthe Generale Conditions, <br />3.1. The provided in P g paragraph 14.07 of the <br />Contract Times commence for run <br />final as spayment in accordance with p <br />and completed and ready <br />30 days after the date when the Contract Times commence f <br />to <br />General Conditions within the <br />3.2, LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time <br />of this Ag h 3.1 above, plus any extensions thereof <br />reement and that OWNER will suffer financial loss if the Work is no <br />essence specified in paragraph <br />completed within the times OWNER if the the <br />ed in accordance with Article 12 of the proving the actual Conditions. loss suffered also recognize OWNER the <br />allow such proof, OWNER <br />delays, expense and difficulties involved in Pr instead of requiring any enalty) <br />Work is not completed on time. Accordingly, <br />and CONTRACTOR agree that as liquidated U dreddand 001100 dollars (b$500 00) for each day mages for delay <br />OWNER Five H Completion until the <br />CONTRACTOR shall pay aragraph 3.1 for Substantial Comp <br />that expires after the time specified in P letion, if CONTRACTOR shall neglect, <br />complete. After Substantial Comp ecified in paragraph 3.1 for <br />Work is substantially comp Work within the time sp ranted by <br />refuse or fail to complete the remaining Went or any proper extension thereof g <br />completion and readiness for final payment completion and readiness for <br />ER CONTRACTOR shall pay OWNER Five Hundred 001100 dollars ($500.00) for each <br />OWN paragraph 3.1 for comp <br />day that expires after the time specified in p <br />final payment. <br />03- 4138.A -R <br />09/03 <br />00500 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.