My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />Article 4. CONTRACT PRICE. <br />OWNER shall pay amount <br />in current funds completion of the <br />the sum Work in <br />amountsadeterm determined pursuant to <br />Documents an amount i <br />paragraphs 4.1 and 4.2 below: <br />4.1. for all Work other than Unit Price Work, a Lump Sum of: N/A <br />(use words) <br />(S 1 <br />figures <br />All specific cash allowances are included in the above price and have been computed in <br />accordance with paragraph 11.02 of the General Conditions; <br />plus <br />4.2, for all Unit Price Work, an amount equal to the sum of the established unit price for <br />each separately identified item of Unit Price Work times the estimated quantity of that item <br />as indicated in this paragraph 4.2: <br />UNIT PRICE WORK <br />' ESTIMATED <br />NO. ITEM UNIT QUANTITY <br />Refer to Exhibit "A" (-) <br />TOTAL OF ALL UNIT PRICES <br />5 <br />UNIT <br />PRICE <br />TOTAL <br />ESTIMATED <br />As provided in paragraph 11 .03 of the General Conditions estimated quantities are not guaranteed, <br />and determinations of actual quantities and classification are to be made by ENGINEER as provided <br />in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in <br />paragraph 11 .03.6 of the General Conditions. <br />Article 5, PAYMENT PROCEDURES. <br />CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General <br />Conditions. Applications for Payment will be processed by ENGINEER as provided in the General <br />Conditions. <br />5.1. Progress Payments; Retainage. OWNER shall make progress payments entsP n account <br />of the contract Price on the basis of CONTRACTOR's Applications as <br />recommended by ENGINEER, on or about the last day of each month during construction as <br />provided in paragraphs 5.1.1. and 5.1.2. below. All such payments will be measured by the <br />schedule of values established in paragraph 2.07 of the General Conditions (and in the case <br />of Unit Price Work based on the number of units completed) or, in the event there is no <br />schedule of values, as provided in the General Requirements. <br />1 09/03 <br />5.1.1. Prior to Substantial Completion, progress payments will be made in an <br />amount equal to the percentage indicated below, but, in each case, less the <br />aggregate of payments previously made and less such amounts as ENGINEER shall <br />00500 -2 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.