My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j1.05 <br />WORK SEQUENCE <br />A. Construct Work in stages to accommodate Owner's <br />coordinate <br />occupancy <br />construction <br />requirements during the construction period, <br />schedule and operations with Owner. <br />1.06 OWNER OCCUPANCY <br />A. Cooperate with Owner to minimize conflict, and to facilitate Owner's <br />toperations. <br />B. Schedule the Work to accommodate this requirement. <br />1.07 WORK BY OTHERS <br />A. The Contractor is advised that work by others will take <br />place during <br />Contractor's <br />the duration of the contract time. It shall be the <br />schedule all work as not <br />to delay or <br />responsibility to coordinate and <br />hinder his work or the work by others. <br />I� <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />!� <br />END OF SECTION <br />03- 4138.A.R <br />01010 -2 <br />09/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.